Changes

Jump to navigation Jump to search
Line 169: Line 169:  
*finishing grades
 
*finishing grades
 
*surface treatment installation: pavers, plants, porous concrete, etc.
 
*surface treatment installation: pavers, plants, porous concrete, etc.
*after rain events (see ESC inspection and maintenance)
+
*after rain events (see [https://s3-ca-central-1.amazonaws.com/trcaca/app/uploads/2020/01/30145157/ESC-Guide-for-Urban-Construction_FINAL.pdf ESC inspection and maintenance])
 
*whenever sub-contractors or utilities begin work (hand-off points)
 
*whenever sub-contractors or utilities begin work (hand-off points)
  

Navigation menu