Changes

Jump to navigation Jump to search
Line 50: Line 50:  
#[[Permeable pavements#Design|Full infiltration Porous Asphalt]]  
 
#[[Permeable pavements#Design|Full infiltration Porous Asphalt]]  
   −
As can be seen, regardless of outlet configuration, Material & Installation expenses represent the largest portion of the total construction costs (82 to 85%). These include costly components such as the, [[Liner|impermeable membrane/liner]], the [[underdrain]], the [[Permeable pavements#Foundation Aggregates|porous asphalt sub-base]] of 50mm [[clear stone]], the conventional asphalt base course (stone reservoir) of 230mm Granular A, [[clear stone|the 19mm Stabilizing course]] and the [[Permeable pavements: Specifications|asphalt (both conventional and permeable)]].
+
As can be seen, regardless of outlet configuration, Material & Installation expenses represent the largest portion of the total construction costs (74 to 77%). These include costly components such as the, [[Liner|impermeable membrane/liner]], the [[underdrain]], the [[Permeable pavements#Foundation Aggregates|porous asphalt sub-base]] of 50mm [[clear stone]], the conventional asphalt base course (stone reservoir) of 230mm Granular A, [[clear stone|the 19mm Stabilizing course]] and the [[Permeable pavements: Specifications|asphalt (both conventional and permeable)]].
    
==Life Cycle Costs==
 
==Life Cycle Costs==

Navigation menu