Changes

Jump to navigation Jump to search
m
Sahlla Abbasi moved page Permeable paving: TTT to Permeable pavements: TTT: Updating terminology for permeable paving to permeable pavements
Line 1: Line 1:  
{{Clickable button|[[File:TTT.png|350 px|link=http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/]]}}
 
{{Clickable button|[[File:TTT.png|350 px|link=http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/]]}}
[[File:LID TTT.png|thumb|[[Permeable paving]] is found within the LID toolbox]]
+
[[File:LID TTT.png|thumb|[[Permeable pavements]] is found within the LID toolbox]]
 
{| class="wikitable"
 
{| class="wikitable"
 
|-
 
|-
Line 59: Line 59:  
|Flow exponent||Suggested value 1
 
|Flow exponent||Suggested value 1
 
|-
 
|-
|Offset height||This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe. [[Permeable paving]]
+
|Offset height||This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe. [[Permeable pavements]]
 
|}
 
|}
 
''<references/>''
 
''<references/>''
 
[[category: modeling]]
 
[[category: modeling]]
339

edits

Navigation menu