The equation for the depth of the stone bed is as follows:  
 
The equation for the depth of the stone bed is as follows:  
  
<math>d= \frac{[Q_c\times R + P - q'\times t ]}{V_{R}}</math>
+
<math>d= \frac{[Q_c\times R + P - f'\times t ]}{V_{R}}</math>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''d'' = Stone bed depth (m)  
 
*''d'' = Stone bed depth (m)  
Line 10: Line 10:
 
*''R'' = A<sub>c</sub>/A<sub>p</sub>; the ratio of contributing drainage area (''A<sub>c</sub>'') to permeable paving area (''A<sub>p</sub>''). Note that the contributing drainage area (''A<sub>c</sub>'') should not contain pervious areas.
 
*''R'' = A<sub>c</sub>/A<sub>p</sub>; the ratio of contributing drainage area (''A<sub>c</sub>'') to permeable paving area (''A<sub>p</sub>''). Note that the contributing drainage area (''A<sub>c</sub>'') should not contain pervious areas.
 
*''P'' = Rainfall depth (m)  
 
*''P'' = Rainfall depth (m)  
*''q''' = Infiltration rate for native soils (m/day)  
+
*''f''' = Design infiltration rate (m/day)  
 
*''t'' = Time to fill stone bed (typically 2 hr)  
 
*''t'' = Time to fill stone bed (typically 2 hr)  
*''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.35 for 50 mm dia. stone)}}  
+
*''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. [[reservoir aggregate|clear stone]])}}  
 
----
 
----
 
For designs that include an underdrain, the maximum depth of the stone reservoir below the invert of the underdrain pipe can be calculated as follows:  
 
For designs that include an underdrain, the maximum depth of the stone reservoir below the invert of the underdrain pipe can be calculated as follows:  
<math>d_{max} = \frac{q' \times t}{V_{R}}</math>  
+
<math>d_{max} = \frac{f' \times t}{V_{R}}</math>  
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''d<sub>max</sub>'' = Stone reservoir depth (m)  
 
*''d<sub>max</sub>'' = Stone reservoir depth (m)  
*''q''' = Infiltration coefficient for native soils (m/hr)  
+
*''f''' = Infiltration coefficient for native soils (m/hr)  
 
*''V<sub>R</sub>'' = Void space ratio for aggregate used (typically 0.35 for 50 mm clear stone)  
 
*''V<sub>R</sub>'' = Void space ratio for aggregate used (typically 0.35 for 50 mm clear stone)  
 
*''t'' = Time to drain (design for 48 hour time to drain is recommended)}}  
 
*''t'' = Time to drain (design for 48 hour time to drain is recommended)}}  
  
The value for native soil infiltration rate (q) used in the above equations should be the design [[infiltration]] rate that incorporates a safety correction factor based on the ratio of the mean value at the proposed bottom elevation of the practice to the mean value in the least permeable soil horizon within 1.5 metres of the proposed bottom elevation.  
+
The value for native soil infiltration rate (f') used in the above equations should be the [[design infiltration rate]] that incorporates a safety correction factor based on the ratio of the mean value at the proposed bottom elevation of the practice to the mean value in the least permeable soil horizon within 1.5 metres of the proposed bottom elevation.  
 
On highly permeable soils (e.g., infiltration rate of 45 mm/hr or greater), a maximum stone reservoir depth of 2 metres is recommended to prevent soil compaction and loss of permeability from the mass of overlying stone and stored water.  
 
On highly permeable soils (e.g., infiltration rate of 45 mm/hr or greater), a maximum stone reservoir depth of 2 metres is recommended to prevent soil compaction and loss of permeability from the mass of overlying stone and stored water.  
 
----
 
----
Line 28: Line 28:
 
<math>A_p= \frac{Q_c\times A_c}{V_R \times dp – P + q'\times t}</math>
 
<math>A_p= \frac{Q_c\times A_c}{V_R \times dp – P + q'\times t}</math>
  
[[category:modeling]]
+
[[category:modelling]]

Revision as of 22:13, 8 March 2018

The following calculation is used to size the stone storage bed (reservoir) used as a base course for designs without underdrains. It is assumed that the footprint of the stone bed will be equal to the footprint of the pavement. The following equations are taken from the ICPI Manual [1] The equation for the depth of the stone bed is as follows:

Where:

  • d = Stone bed depth (m)
  • Qc = Depth of runoff from contributing drainage area, not including permeable paving surface (m)
  • R = Ac/Ap; the ratio of contributing drainage area (Ac) to permeable paving area (Ap). Note that the contributing drainage area (Ac) should not contain pervious areas.
  • P = Rainfall depth (m)
  • f' = Design infiltration rate (m/day)
  • t = Time to fill stone bed (typically 2 hr)
  • VR = Void ratio for stone bed (typically 0.4 for 50 mm dia. clear stone)

For designs that include an underdrain, the maximum depth of the stone reservoir below the invert of the underdrain pipe can be calculated as follows:

Where:

  • dmax = Stone reservoir depth (m)
  • f' = Infiltration coefficient for native soils (m/hr)
  • VR = Void space ratio for aggregate used (typically 0.35 for 50 mm clear stone)
  • t = Time to drain (design for 48 hour time to drain is recommended)

The value for native soil infiltration rate (f') used in the above equations should be the design infiltration rate that incorporates a safety correction factor based on the ratio of the mean value at the proposed bottom elevation of the practice to the mean value in the least permeable soil horizon within 1.5 metres of the proposed bottom elevation. On highly permeable soils (e.g., infiltration rate of 45 mm/hr or greater), a maximum stone reservoir depth of 2 metres is recommended to prevent soil compaction and loss of permeability from the mass of overlying stone and stored water.


When sizing the area of permeable paving based on the contributing drainage area, the following equation may be used: Failed to parse (syntax error): {\displaystyle A_p= \frac{Q_c\times A_c}{V_R \times dp – P + q'\times t}}

  1. Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design, Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute. Burlington, ON.