The following maintenance procedures and preventative measures should be incorporated into a maintenance plan:  
 
The following maintenance procedures and preventative measures should be incorporated into a maintenance plan:  
 +
[[File:MaintenancePICP.png|thumb|400px|Vehicle used for vacuum maintenance of permeable pavements (Source: STEP). ]]
 
*'''Surface Sweeping''': Sweeping should occur once or twice a year with a commercial vacuum sweeping unit to mitigate sediment accumulation and ensure continued porosity. Permeable pavement should  not be washed with high pressure water systems or compressed air units, because they will push particles deeper into the pavement.<ref name=manchester2002>Philadelphia Water Department (PWD). 2007. Philadelphia Stormwater Management Guidance Manual. Philadelphia </ref>
 
*'''Surface Sweeping''': Sweeping should occur once or twice a year with a commercial vacuum sweeping unit to mitigate sediment accumulation and ensure continued porosity. Permeable pavement should  not be washed with high pressure water systems or compressed air units, because they will push particles deeper into the pavement.<ref name=manchester2002>Philadelphia Water Department (PWD). 2007. Philadelphia Stormwater Management Guidance Manual. Philadelphia </ref>
 
*'''Inlet Structures''': Drainage pipes and structures within or draining to the subsurface bedding beneath porous pavement should be cleaned out on regular intervals .<ref name=manchester2002/>
 
*'''Inlet Structures''': Drainage pipes and structures within or draining to the subsurface bedding beneath porous pavement should be cleaned out on regular intervals .<ref name=manchester2002/>
Line 11: Line 12:  
*'''Potholes''': For porous asphalt or pervious concrete, isolated potholes can be patched with standard patching mixes. Patching can continue until the structural integrity of the pavement has been compromised or stormwater can no longer drain to the aggregate base. Then the surface will need to be torn up and replaced.  
 
*'''Potholes''': For porous asphalt or pervious concrete, isolated potholes can be patched with standard patching mixes. Patching can continue until the structural integrity of the pavement has been compromised or stormwater can no longer drain to the aggregate base. Then the surface will need to be torn up and replaced.  
 
*'''Uneven Pavers''': An uneven paver surface can be repaired by pulling up the pavers, redistributing the bedding layer, and then placing the pavers back. New filler stone will need to be swept into the replaced pavers. Typically the pavers are packed very tightly, and breaking one or more pavers will be necessary to pull up a group of pavers. Keeping a set of replacement pavers after construction will be useful for making future repairs.
 
*'''Uneven Pavers''': An uneven paver surface can be repaired by pulling up the pavers, redistributing the bedding layer, and then placing the pavers back. New filler stone will need to be swept into the replaced pavers. Typically the pavers are packed very tightly, and breaking one or more pavers will be necessary to pull up a group of pavers. Keeping a set of replacement pavers after construction will be useful for making future repairs.
*'''Weeds''': Over time, weed growth may become a problem, particularly on surfaces with infrequent traffic. Weeds can be an aesthetic issue and may also reduce the infiltration through the pavement. Keeping the pavement surface free of organic material through regular sweeping and vacuuming can impede weeds from taking root. Pulling weeds when they are small will limit damage to the pavement and loss of filler material between pavers. Ontario has banned the use of cosmetic herbicides.  
+
*'''Weeds''': Over time, weed growth may become an aesthetic problem, particularly on surfaces with infrequent traffic. Keeping the pavement surface free of organic material through regular sweeping and vacuuming can impede weeds from taking root. Ontario has banned the use of cosmetic herbicides for weed control.  
 +
*'''Vacuuming''': Annual vacuuming of permeable interlocking concrete pavers can increase the operational lifespan of these pavers. <ref> Jennifer Drake, Andrea Bradford, Tim Van Seters and Glenn MacMillan, 2016. Evaluation of Permeable Pavements in Cold Climates. accessed at https://sustainabletechnologies.ca/app/uploads/2013/02/KPP-Final-2012.pdf </ref>
 +
*'''Winter Maintenance''': Sand should not be spread on permeable pavement as it can quickly lead to clogging. Deicers should only be used in moderation and only when needed because dissolved constituents are not removed by the pavement system. Pilot studies at the University of New Hampshire Stormwater Center have found that permeable pavement requires 75% less salt than conventional pavement over the course of a typical winter season. <ref>University of New Hampshire Stormwater Center (UNHSC). 2007. 2007 Annual Report. Durham, NH.</ref>
 +
*'''Snow Plowing''': Permeable pavement is plowed for snow removal like any other pavement. When groundwater contamination from chlorides is a concern, plowed snow piles and snow melt should not be directed to permeable paver and porous pavement systems<ref>Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design,
 +
Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute.Burlington, ON.</ref><br> Also, plowed snow/snow piles should not be stored on top of permeable pavements, since this snow often contains granular materials which can contribute to clogging
    +
Annual inspections of permeable pavement should be conducted in the spring prior to onset of the summer thunderstorm season. These inspections should check for evidence of spills and surface ponding (staining or sediment accumulation on pavement surface), damage and deterioration.
   −
 
+
For more detailed guidance, refer to STEP's Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide and Permeable Pavements Inspection and Maintenance Fact Sheet, both of which can be accessed [https://sustainabletechnologies.ca/home/urban-runoff-green-infrastructure/low-impact-development/low-impact-development-stormwater-practice-inspection-and-maintenance-guide/ here]
*'''Winter Maintenance''': Sand should not be spread on permeable pavement as it can quickly lead to clogging. Deicers should only be used in moderation and only when needed because dissolved constituents are not removed by the pavement system. Pilot studies at the University of New Hampshire Stormwater Center have found that permeable pavement requires 75% less salt than conventional pavement over the course of a typical winter season.<ref>University of New Hampshire Stormwater Center (UNHSC). 2007. 2007 Annual Report. Durham, NH.</ref>
  −
*'''Snow Plowing''': Permeable pavement is plowed for snow removal like any other pavement. When groundwater contamination from chlorides is a concern, plowed snow piles and snow melt should not be directed to permeable paver and porous pavement systems<ref>Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design,
  −
Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute.Burlington, ON.</ref><br>
        −
Annual inspections of permeable pavement should be conducted in the spring to ensure continued infiltration performance. These inspections should check for spilling or deterioration and test to whether water is draining between storms.
      
----
 
----