Changes

Jump to navigation Jump to search
Line 27: Line 27:  
<gallery mode="packed-hover" perrow=5 widths=150px heights=150px>
 
<gallery mode="packed-hover" perrow=5 widths=150px heights=150px>
 
File:Frankenthal - Versickerungsfähige Pflaster.jpg|Permeable Interlocking Concrete Pavers (PICP) on a roadway.  
 
File:Frankenthal - Versickerungsfähige Pflaster.jpg|Permeable Interlocking Concrete Pavers (PICP) on a roadway.  
File:Gridpavers.jpg|Permeable Grid System in parking stalls filled with gravel (Source: Alexander Eichler).
+
File:Gridpaver.png.jpg|Permeable Grid System filled with gravel (Source: Alexander Eichler).
 
File:ArticulatedBlockPavers.png|Permeable Articulated Block Systems; mostly used for erosion control sites.  
 
File:ArticulatedBlockPavers.png|Permeable Articulated Block Systems; mostly used for erosion control sites.  
 
File:perviousconcrete.png|Pervious Concrete applied to an alleyway in Chicago (Source: City of Chicago).
 
File:perviousconcrete.png|Pervious Concrete applied to an alleyway in Chicago (Source: City of Chicago).
Line 125: Line 125:  
Permeable paving is not typically used in locations subject to heavy loads. However, some permeable pavements are designed for heavy loads and have been used in commercial port loading and storage areas.  A flexible geogrid structure may be used to improve the structural capacity of the pavement by spreading loads over a larger area.  Increasing the base thickness will also improve structural capacity.
 
Permeable paving is not typically used in locations subject to heavy loads. However, some permeable pavements are designed for heavy loads and have been used in commercial port loading and storage areas.  A flexible geogrid structure may be used to improve the structural capacity of the pavement by spreading loads over a larger area.  Increasing the base thickness will also improve structural capacity.
 
<gallery mode="packed" widths=300px heights=300px>
 
<gallery mode="packed" widths=300px heights=300px>
File:PaveDrain.jpg|PaveDrain at the LSRCA headquarters in Newmarket, ON is an example of an articulated block system designed for heavy loads.
+
File:Articulatedblocksystem.png|Permeable articulated block system at the LSRCA headquarters in Newmarket, ON is designed for heavy loads.
 
File:Geogitter-4.jpg|Geogrids like these are sometimes incorporated into the layers of permeable pavement foundation aggregates to provide additional stability and conserve aggregate material.
 
File:Geogitter-4.jpg|Geogrids like these are sometimes incorporated into the layers of permeable pavement foundation aggregates to provide additional stability and conserve aggregate material.
 
</gallery>
 
</gallery>
 +
 
===Modelling permeable pavements in the Treatment Train Tool===
 
===Modelling permeable pavements in the Treatment Train Tool===
 
'''[[Permeable pavements: TTT]]'''
 
'''[[Permeable pavements: TTT]]'''
Line 210: Line 211:  
|style="text-align: center;" |King City, Ontario
 
|style="text-align: center;" |King City, Ontario
 
|style="text-align: center;" |'''<u><span title="Note: In this study, there was no underdrain in the pavement base, but an underdrain was located 1 m below the native soils to allow for sampling of infiltrated water. Temporary water storage fluctuations in the base were similar to those expected in a no underdrain design." >99%*</span></u>'''
 
|style="text-align: center;" |'''<u><span title="Note: In this study, there was no underdrain in the pavement base, but an underdrain was located 1 m below the native soils to allow for sampling of infiltrated water. Temporary water storage fluctuations in the base were similar to those expected in a no underdrain design." >99%*</span></u>'''
|style="text-align: center;" |[https://sustainabletechnologies.ca/app/uploads/2013/03/PP_FactsheetSept2011-compressed.pdf/ TRCA (2008)]
+
|style="text-align: center;" |<span class="plainlinks">[https://sustainabletechnologies.ca/app/uploads/2013/03/PP_FactsheetSept2011-compressed.pdf TRCA (2008)]</span>
 
|-
 
|-
 
|rowspan="7" style="text-align: center;" | Permeable pavement with underdrain
 
|rowspan="7" style="text-align: center;" | Permeable pavement with underdrain
 
|-
 
|-
 
|style="text-align: center;" |Vaughan, Ontario
 
|style="text-align: center;" |Vaughan, Ontario
|style="text-align: center;" |45%<sup>2</sup>
+
|style="text-align: center;" |'''<u><span title="Note: Runoff reduction estimates are based on differences in runoff volume between the practice and a conventional impervious surface over the period of monitoring.">45%*</span></u>'''
|style="text-align: center;" |[https://sustainabletechnologies.ca/app/uploads/2016/02/KPP-Ext_FinalReport_Dec2015.pdf/ Van Seters and Drake (2015)]
+
|style="text-align: center;" |<span class="plainlinks">[https://sustainabletechnologies.ca/app/uploads/2016/02/KPP-Ext_FinalReport_Dec2015.pdf Van Seters and Drake (2015)]</span>
 
|-
 
|-
 
|style="text-align: center;" |North Carolina
 
|style="text-align: center;" |North Carolina
Line 237: Line 238:  
|style="text-align: center;" |Mississauga
 
|style="text-align: center;" |Mississauga
 
|style="text-align: center;" |61 to 99%
 
|style="text-align: center;" |61 to 99%
|style="text-align: center;" |[https://cvc.ca/wp-content/uploads/2018/05/IMAX-Low-Impact-Development-Monitoring-Case-Study-may-24.pdf/ CVC (2018)]
+
|style="text-align: center;" |<span class="plainlinks">[https://cvc.ca/wp-content/uploads/2018/05/IMAX-Low-Impact-Development-Monitoring-Case-Study-may-24.pdf CVC (2018)]</span>
 
|-
 
|-
 
| colspan="2" style="text-align: center;" |'''<u><span title="Note: This estimate is provided only for the purpose of initial screening of LID practices suitable for achieving stormwater management objectives and targets.  Performance of individual facilities will vary depending on site specific contexts and facility design parameters and should be estimated as part of the design process and submitted with other documentation for review by the approval authority." >Runoff Reduction Estimate*</span></u>'''
 
| colspan="2" style="text-align: center;" |'''<u><span title="Note: This estimate is provided only for the purpose of initial screening of LID practices suitable for achieving stormwater management objectives and targets.  Performance of individual facilities will vary depending on site specific contexts and facility design parameters and should be estimated as part of the design process and submitted with other documentation for review by the approval authority." >Runoff Reduction Estimate*</span></u>'''
Line 285: Line 286:  
==Gallery==
 
==Gallery==
 
{{:Permeable pavements: Gallery}}
 
{{:Permeable pavements: Gallery}}
----
+
 
 +
==References==
 +
Also see references as direct web page links above.