Changes

Jump to navigation Jump to search
Line 210: Line 210:  
|style="text-align: center;" |King City, Ontario
 
|style="text-align: center;" |King City, Ontario
 
|style="text-align: center;" |'''<u><span title="Note: In this study, there was no underdrain in the pavement base, but an underdrain was located 1 m below the native soils to allow for sampling of infiltrated water. Temporary water storage fluctuations in the base were similar to those expected in a no underdrain design." >99%*</span></u>'''
 
|style="text-align: center;" |'''<u><span title="Note: In this study, there was no underdrain in the pavement base, but an underdrain was located 1 m below the native soils to allow for sampling of infiltrated water. Temporary water storage fluctuations in the base were similar to those expected in a no underdrain design." >99%*</span></u>'''
|style="text-align: center;" |<span class="plainlinks">[https://sustainabletechnologies.ca/app/uploads/2013/03/PP_FactsheetSept2011-compressed.pdf/ TRCA (2008)</span>
+
|style="text-align: center;" |<span class="plainlinks">[https://sustainabletechnologies.ca/app/uploads/2013/03/PP_FactsheetSept2011-compressed.pdf/ TRCA (2008)]</span>
 
|-
 
|-
 
|rowspan="7" style="text-align: center;" | Permeable pavement with underdrain
 
|rowspan="7" style="text-align: center;" | Permeable pavement with underdrain
Line 237: Line 237:  
|style="text-align: center;" |Mississauga
 
|style="text-align: center;" |Mississauga
 
|style="text-align: center;" |61 to 99%
 
|style="text-align: center;" |61 to 99%
|style="text-align: center;" |<span class="plainlinks">[https://cvc.ca/wp-content/uploads/2018/05/IMAX-Low-Impact-Development-Monitoring-Case-Study-may-24.pdf/ CVC (2018)]</span>
+
|style="text-align: center;" |<span class="plainlinks">[https://cvc.ca/wp-content/uploads/2018/05/IMAX-Low-Impact-Development-Monitoring-Case-Study-may-24.pdf CVC (2018)]</span>
 
|-
 
|-
 
| colspan="2" style="text-align: center;" |'''<u><span title="Note: This estimate is provided only for the purpose of initial screening of LID practices suitable for achieving stormwater management objectives and targets.  Performance of individual facilities will vary depending on site specific contexts and facility design parameters and should be estimated as part of the design process and submitted with other documentation for review by the approval authority." >Runoff Reduction Estimate*</span></u>'''
 
| colspan="2" style="text-align: center;" |'''<u><span title="Note: This estimate is provided only for the purpose of initial screening of LID practices suitable for achieving stormwater management objectives and targets.  Performance of individual facilities will vary depending on site specific contexts and facility design parameters and should be estimated as part of the design process and submitted with other documentation for review by the approval authority." >Runoff Reduction Estimate*</span></u>'''
339

edits

Navigation menu