Difference between revisions of "Permeable pavement: Plan review"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
(Created page with "==Plan checklist== #Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement? #To avoid soil disturbance and co...")
 
m
Line 1: Line 1:
 
==Plan checklist==
 
==Plan checklist==
#Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement?
+
#Do the plans include an appropriate construction sequence that is specific to the construction of the [[permeable pavement]]?
 
#To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
 
#To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
 
#Do the plans include an appropriate cross-sectional detail for the permeable pavement?
 
#Do the plans include an appropriate cross-sectional detail for the permeable pavement?

Revision as of 13:42, 15 December 2017

Plan checklist[edit]

  1. Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement?
  2. To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
  3. Do the plans include an appropriate cross-sectional detail for the permeable pavement?