Changes

Jump to navigation Jump to search
m
no edit summary
Line 9: Line 9:  
:Higher flows are diverted and do not enter the infiltration practice. A pipe can by used for this, but a weir or [[curb cuts|curb cut]] minimizes clogging and reduces the maintenance frequency.
 
:Higher flows are diverted and do not enter the infiltration practice. A pipe can by used for this, but a weir or [[curb cuts|curb cut]] minimizes clogging and reduces the maintenance frequency.
   −
==
+
==Overflow elevation==
 
The invert of the overflow should be placed at the maximum water surface elevation of the bioretention area. i.e. the maximum ponding depth. A good starting point is around 300 mm over the surface of the practice. However, consideration should be given to public safety and time for the ponded water to drain. See [[Bioretention: Sizing#Additional step for system without underdrain|Bioretention]]
 
The invert of the overflow should be placed at the maximum water surface elevation of the bioretention area. i.e. the maximum ponding depth. A good starting point is around 300 mm over the surface of the practice. However, consideration should be given to public safety and time for the ponded water to drain. See [[Bioretention: Sizing#Additional step for system without underdrain|Bioretention]]
  
8,255

edits

Navigation menu