Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1: −
[[File:LCCT Tool 2021.PNG|thumb|500px|link=https://torontoregion-my.sharepoint.com/:u:/g/personal/christy_graham_trca_ca/ETIhvX1R2kJHsLXI6M-xSYMBHycxqvrwicCy1RTBr_aSNA?e=mVJDKN|Version 3.0 of the LID Life Cycle Costing Tool that was updated in December of 2021. (TRCA, 2019)<ref> TRCA. 2019. Low Impact Development Life Cycle Costing Tool. Accessed 22 November 2022. https://sustainabletechnologies.ca/lid-lcct/</ref>)]]
+
[[File:LCCT Tool 2021.PNG|thumb|500px|link=https://sustainabletechnologies.ca/lid-lcct/|Version 3.0 of the LID Life Cycle Costing Tool that was updated in December of 2021. (TRCA, 2019)<ref> TRCA. 2019. Low Impact Development Life Cycle Costing Tool. Accessed 22 November 2022. https://sustainabletechnologies.ca/lid-lcct/</ref>)]]
    
{{TOClimit|2}}
 
{{TOClimit|2}}
Line 48: Line 48:  
[[File:C.C 25mm Retention Partial Infiltration.png|thumb|left|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Partial Infiltration Design, 25 mm Retention''']]
 
[[File:C.C 25mm Retention Partial Infiltration.png|thumb|left|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Partial Infiltration Design, 25 mm Retention''']]
   −
[[File:C.C 25mm Retention No Infiltration.png|thumb|center|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Treatment''']]</br>
+
[[File:C.C 25mm Retention No Infiltration update.png|thumb|center|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Treatment''']]</br>
    
<small>'''Note:''' Click on each image to enlarge to view associated construction cost comparison results.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated construction cost comparison results.</small><br>

Navigation menu