Changes

Jump to navigation Jump to search
Line 29: Line 29:  
This report by CVC highlights the benefits of a multi-LID retrofit on a mixed-use street with residential homes and an education centre on Elm Drive in Mississauga. The retrofit included, a [[Permeable pavement]] sidewalk and parking layby along with six [[Bioretention]] cells connected with an [[Underdrain]]. The site now provides stormwater treatment by improving the quality of stormwater discharged (thermal mitigation, reduction in runoff volume to storm sewers, etc.) to Cooksville Creek. Read more by clicking the button above.
 
This report by CVC highlights the benefits of a multi-LID retrofit on a mixed-use street with residential homes and an education centre on Elm Drive in Mississauga. The retrofit included, a [[Permeable pavement]] sidewalk and parking layby along with six [[Bioretention]] cells connected with an [[Underdrain]]. The site now provides stormwater treatment by improving the quality of stormwater discharged (thermal mitigation, reduction in runoff volume to storm sewers, etc.) to Cooksville Creek. Read more by clicking the button above.
   −
{{Clickable button|[[File:IMAX location.PNG|150 px|link=https://sustainabletechnologies.ca/app/uploads/2022/03/rpt_IMAXreport_f_20220222.pdf]]}}
+
{{Clickable button|[[File:IMAX report pic.PNG|150 px|link=https://sustainabletechnologies.ca/app/uploads/2022/03/rpt_IMAXreport_f_20220222.pdf]]}}
    
This report, released by CVC this year (2022) provides a thorough overview of the monitoring work done at the Imax Corporate Headquarters, located in Mississauga, ON. The parking lot was expanded and retrofitted with a combination of traditional asphalt and [[Permeable pavement]]. The asphalt runoff drains to one of three vegetated [[Bioretention]] units on site. The The parking lot runoff is collected, absorbed and filtered by these LID practices before entering a [[Wetland]] adjacent to the parking lot. Read more about these features performance over this multi-year study by clicking the button above.
 
This report, released by CVC this year (2022) provides a thorough overview of the monitoring work done at the Imax Corporate Headquarters, located in Mississauga, ON. The parking lot was expanded and retrofitted with a combination of traditional asphalt and [[Permeable pavement]]. The asphalt runoff drains to one of three vegetated [[Bioretention]] units on site. The The parking lot runoff is collected, absorbed and filtered by these LID practices before entering a [[Wetland]] adjacent to the parking lot. Read more about these features performance over this multi-year study by clicking the button above.

Navigation menu