Changes

Jump to navigation Jump to search
Line 243: Line 243:     
Creekside Crossing is a communal centre in a heavily urbanized area of Mississauga. Due to extensive development in the area, several Low Impact Development (LID) practices were constructed on site. All combined, the LIDs were able to fulfill the requirement of the TTRCA's water balance objective of retaining runoff from a 10 mm rain event onsite (usually set at 5 mm, but due to the rehabilitation work was completed in a floodplain this objective was increased twofold. The LIDs, which include [[Bioretention]] areas, [[Soakaways]]/Infiltration galleries, [[Vegetated filter strips]] and [[Permeable pavement]], achieve the water balance objective through attenuation/infiltration and evapotranspiration. To read more about this site and the performance of the LIDs mentioned, click on the button above.
 
Creekside Crossing is a communal centre in a heavily urbanized area of Mississauga. Due to extensive development in the area, several Low Impact Development (LID) practices were constructed on site. All combined, the LIDs were able to fulfill the requirement of the TTRCA's water balance objective of retaining runoff from a 10 mm rain event onsite (usually set at 5 mm, but due to the rehabilitation work was completed in a floodplain this objective was increased twofold. The LIDs, which include [[Bioretention]] areas, [[Soakaways]]/Infiltration galleries, [[Vegetated filter strips]] and [[Permeable pavement]], achieve the water balance objective through attenuation/infiltration and evapotranspiration. To read more about this site and the performance of the LIDs mentioned, click on the button above.
 +
 +
{{Clickable button|[[File:O'COnnor Park.PNG|130 px|link=https://cvc.ca/wp-content/uploads//2021/07/CaseStudy_O_Connor_Final.pdf]]}}
 +
 +
O’Connor Park is located on Bala Drive in the west end of Mississauga, ON. in the Sawmill Creek subwatershed, that later flows into the Credit River and Lake Ontario. The primary LID installation completed in the park were [[Bioretention]], [[Bioswales]], [[Permeable pavement]], and [[Infiltration trenches]], running along the soccer fields on site that later drains into the pre-existing small natural [[Wetlands]] and nearby pond. The O’Connor Park
 +
Development Project Team received the Brenda Sakauye Environment Award in recognition of the park’s advancement of the City of Mississauga’s Living Green Master Plan, as well as the 2012 Mississauga Urban Design Award of Merit for Community Scale, Living Green, Innovation and Execution. Learn more about the award-winning design that went into O'Connor Park by clicking the button above.
     

Navigation menu