Changes

Jump to navigation Jump to search
Line 203: Line 203:     
This report by TRCA's STEP group highlights how in July of 2014, the City of Brampton constructed two [[Bioswales]] featuring impermeable liners within the road right-of-way of County Court Boulevard, a medium traffic collector road that services residential, institutional and parkland areas in the neighbourhood. In November 2014, simulated storm event tests were completed to verify that each swale was functioning as intended and examine runoff reduction performance during a medium-sized rain event (i.e. approx. 12 mm, 40 minute rain storm). Results show that East and West Swales retained 32% and 10% of the water, respectively. This suggests that substantial runoff volume reduction benefits can be provided by swales designed with impermeable liners. To learn more about these swale configurations, and their performance click the button above.  
 
This report by TRCA's STEP group highlights how in July of 2014, the City of Brampton constructed two [[Bioswales]] featuring impermeable liners within the road right-of-way of County Court Boulevard, a medium traffic collector road that services residential, institutional and parkland areas in the neighbourhood. In November 2014, simulated storm event tests were completed to verify that each swale was functioning as intended and examine runoff reduction performance during a medium-sized rain event (i.e. approx. 12 mm, 40 minute rain storm). Results show that East and West Swales retained 32% and 10% of the water, respectively. This suggests that substantial runoff volume reduction benefits can be provided by swales designed with impermeable liners. To learn more about these swale configurations, and their performance click the button above.  
 +
{{Clickable button|[[File:Portico church retrofit.PNG|130 px|link=https://cvc.ca/wp-content/uploads//2021/07/CaseStudy_Portico_Final.pdf]]}}
 +
 +
The PORTICO Community Church site, located in Mississauga, ON. was one of the first site to develop an LID parking lot in the province, in accordance with [https://sustainabletechnologies.ca/app/uploads/2013/01/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf|CVC/TRCA LID Stormwater Guidelines]. The 2 hectare parking lot at Portico Community Church features [[Permeable pavement]], [[Bioretention]] and two [[Bioswales]]. These LID features help to treat and reduce runoff flowing into the Credit River. Read more about this site and how the church , CVC and volunteers worked together to set up an ongoing maintenance schedule for the LID installations mentioned by clicking the button above.
     

Navigation menu