Creekside Crossing is a communal centre in a heavily urbanized area of Mississauga. Due to extensive development in the area, several Low Impact Development (LID) practices were constructed on site. All combined, the LIDs were able to fulfill the requirement of the TTRCA's water balance objective of retaining runoff from a 10 mm rain event onsite (usually set at 5 mm, but due to the rehabilitation work was completed in a floodplain this objective was increased twofold. The LIDs, which include [[Bioretention]] areas, [[Soakaways]]/Infiltration galleries, [[Vegetated filter strips]] and [[Permeable pavement]], achieve the water balance objective through attenuation/infiltration and evapotranspiration. To read more about this site and the performance of the LIDs mentioned, click on the button above.
 
Creekside Crossing is a communal centre in a heavily urbanized area of Mississauga. Due to extensive development in the area, several Low Impact Development (LID) practices were constructed on site. All combined, the LIDs were able to fulfill the requirement of the TTRCA's water balance objective of retaining runoff from a 10 mm rain event onsite (usually set at 5 mm, but due to the rehabilitation work was completed in a floodplain this objective was increased twofold. The LIDs, which include [[Bioretention]] areas, [[Soakaways]]/Infiltration galleries, [[Vegetated filter strips]] and [[Permeable pavement]], achieve the water balance objective through attenuation/infiltration and evapotranspiration. To read more about this site and the performance of the LIDs mentioned, click on the button above.
   −
{{Clickable button|[[File:Unitarian congregation.PNG|130 px|link=https://cvc.ca/wp-content/uploads//2021/07/CaseStudy_Unitarian_Final.pdf]]}}
+
{{Clickable button|[[File:Unitarian congregation.PNG|130 px|link=https://files.cvc.ca/cvc/uploads/2014/03/Unitarian-Case-Study_Final.pdf]]}}
    
The Unitarian Congregation in Mississauga (UCM) is located on South Service Road within the Cooksville Creek Watershed. that drains into Lake Ontario. The site sits on sandy soils, which are ideal conditions for low impact development practices that infiltrate stormwater. A  large [[Bioretention]] cell was constructed in the center of the parking lot. The bioretention cell filters and absorbs rainwater running off the parking lot. The bioretention cell is also landscaped with many native plants that create habitat for the numerous bird and insect species on the site. [[Filter strips]], were added a year after construction of the site, which successfully stabilized the
 
The Unitarian Congregation in Mississauga (UCM) is located on South Service Road within the Cooksville Creek Watershed. that drains into Lake Ontario. The site sits on sandy soils, which are ideal conditions for low impact development practices that infiltrate stormwater. A  large [[Bioretention]] cell was constructed in the center of the parking lot. The bioretention cell filters and absorbs rainwater running off the parking lot. The bioretention cell is also landscaped with many native plants that create habitat for the numerous bird and insect species on the site. [[Filter strips]], were added a year after construction of the site, which successfully stabilized the
Line 466: Line 466:  
==Construction Considerations==
 
==Construction Considerations==
   −
{{Clickable button|[[File:Lessons learned contractors.PNG|120 px|link=https://cvc.ca/wp-content/uploads/2014/01/Construction-Case-Study-v6-ContractorFINAL.pdf]]}}
+
{{Clickable button|[[File:Lessons learned contractors.PNG|120 px|link=https://files.cvc.ca/cvc/uploads/2014/12/Construction-Case-Study-v6-ContractorFINAL.pdf]]}}
    
CVC, back in 2014 developed a document aimed at contractors, whose clients (municipalities) are facing many stormwater challenges, including aging and deficient infrastructure, frequent extreme weather, flash flooding, and degrading water quality. Municipalities are relying on stormwater management ponds for flood control and water quality treatment, but they are consistently looking at Low Impact Development (LID) as a way to shore up their stormwater management strategy. This document and CVC’s, [https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf LID Construction Guide] are a great way for contractors to understand what Municipalities are looking for who want to implement well designed and well-performing LID installations. Click the button above to learn more.
 
CVC, back in 2014 developed a document aimed at contractors, whose clients (municipalities) are facing many stormwater challenges, including aging and deficient infrastructure, frequent extreme weather, flash flooding, and degrading water quality. Municipalities are relying on stormwater management ponds for flood control and water quality treatment, but they are consistently looking at Low Impact Development (LID) as a way to shore up their stormwater management strategy. This document and CVC’s, [https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf LID Construction Guide] are a great way for contractors to understand what Municipalities are looking for who want to implement well designed and well-performing LID installations. Click the button above to learn more.
   −
{{Clickable button|[[File:Lessons learned for design eng etc.PNG|120 px|link=https://cvc.ca/wp-content/uploads/2014/01/Construction-Case-Study-v6-Designer-Consulting-EngineerFINAL.pdf]]}}
+
{{Clickable button|[[File:Lessons learned for design eng etc.PNG|120 px|link=https://cvc.ca/document/lessons-learned-in-low-impact-development-construction-for-designers-consulting-engineers-municipalities-landowners-and-inspectors/?access=31546c8b6151607c77499392d3459512]]}}
   −
CVC, back in 2014 developed another document aimed at designers, consulting engineers, municipalities, landowners and inspectors. This document and CVC’s, [https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf LID Construction Guide] will allow you to be able to:
+
CVC, back in 2014 developed another document aimed at designers, consulting engineers, municipalities, landowners and inspectors. This document and CVC’s, [https://files.cvc.ca/cvc/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf] will allow you to be able to:
 
*Minimize challenges/issues during the plan review and permitting process
 
*Minimize challenges/issues during the plan review and permitting process
 
*Minimize additional site visits to review and correct deficiencies
 
*Minimize additional site visits to review and correct deficiencies
Line 486: Line 486:       −
Read more about [[Construction]] Considerations here.
+
Read more about [[Construction]] Considerations [[Construction|here]].