[[File:Cover photo.PNG|500px|thumb|link=https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf|the content on this page and subsequent pages separated by LID practice are based on the Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide, 2016<ref>TRCA. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. Version 1.0. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref> shown above. To read the guide in its entirety you can click the image above.]]<br>
 
[[File:Cover photo.PNG|500px|thumb|link=https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf|the content on this page and subsequent pages separated by LID practice are based on the Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide, 2016<ref>TRCA. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. Version 1.0. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref> shown above. To read the guide in its entirety you can click the image above.]]<br>
   −
{{TOClimit|2}}
+
{{TOClimit|3}}
<br>
+
 
 
==Overview==
 
==Overview==
   Line 53: Line 53:     
===Construction Inspections===
 
===Construction Inspections===
 +
[[File:Construction duties flowchart.png|400px|thumb|Recommended construction and assumption inspection process (adapted from TRCA, 2016).<ref>TRCA. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. Version 1.0. Figure 6,3. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref>]]
 +
 
Construction inspections should be a shared responsibility between the property owner or their project manager, the designers (i.e., engineer and landscape designer) and the construction contractors. Many municipalities already conduct some form of inspection of infrastructure they will eventually assume during its construction. Those that do not, might choose to work with internal departments (e.g., road or building inspectors, parks/landscaping inspectors) or other agencies (e.g., conservation authorities) that routinely conduct inspections at active construction sites. With adequate training and staff resources, it might be possible to integrate stormwater BMP inspection duties during construction into existing programs. If the workload or skill set needed is beyond what existing programs can handle, or the timing of other types of inspections do not coincide with critical timing of BMP construction inspections, hiring of trained contractors or allocation of dedicated stormwater infrastructure program staff may be necessary.  
 
Construction inspections should be a shared responsibility between the property owner or their project manager, the designers (i.e., engineer and landscape designer) and the construction contractors. Many municipalities already conduct some form of inspection of infrastructure they will eventually assume during its construction. Those that do not, might choose to work with internal departments (e.g., road or building inspectors, parks/landscaping inspectors) or other agencies (e.g., conservation authorities) that routinely conduct inspections at active construction sites. With adequate training and staff resources, it might be possible to integrate stormwater BMP inspection duties during construction into existing programs. If the workload or skill set needed is beyond what existing programs can handle, or the timing of other types of inspections do not coincide with critical timing of BMP construction inspections, hiring of trained contractors or allocation of dedicated stormwater infrastructure program staff may be necessary.  
   −
The frequency of Construction inspections may be determined by the municipal stormwater infrastructure program policy or may be general program targets (e.g., weekly, after large storm events, as triggered by construction milestones and hand-off points between different contractors). At a minimum, inspections should occur just prior to the onset of BMP construction to ensure compliance with erosion and sediment control plans and after any large storm event (e.g., 15 mm rainfall depth or greater) during the BMP construction period.
+
The frequency of Construction inspections may be determined by the municipal stormwater infrastructure program policy or may be general program targets (e.g., weekly, after large storm events, as triggered by construction milestones and hand-off points between different contractors). At a minimum, inspections should occur just prior to the onset of BMP construction to ensure compliance with erosion and sediment control plans and after any large storm event (e.g., 15 mm rainfall depth or greater) during the BMP construction period. The figure to the right describes a recommended process for conducting construction and assumption inspections.
    
Feedback from Construction inspections should be used to correct any issues associated with BMP installation or Erosion Sediment Controls (ESCs) and to identify when changes to the installation procedures, ESCs or BMP design are needed due to site circumstances or complications encountered. In cases where the project proponent or property owner uses a formal bidding process to select a construction contractor, opportunities exist to include special provisions in tender documents or contracts that will help ensure that LID BMPs receive adequate inspection and maintenance during construction.
 
Feedback from Construction inspections should be used to correct any issues associated with BMP installation or Erosion Sediment Controls (ESCs) and to identify when changes to the installation procedures, ESCs or BMP design are needed due to site circumstances or complications encountered. In cases where the project proponent or property owner uses a formal bidding process to select a construction contractor, opportunities exist to include special provisions in tender documents or contracts that will help ensure that LID BMPs receive adequate inspection and maintenance during construction.
Line 78: Line 80:  
#Prior to termination of the warranty or establishment period (e.g., 2 years after substantial completion of construction), release of any maintenance holdbacks (if applicable) and assumption by the property owner.
 
#Prior to termination of the warranty or establishment period (e.g., 2 years after substantial completion of construction), release of any maintenance holdbacks (if applicable) and assumption by the property owner.
   −
Feedback from inspections should be used to correct any deviations from the approved design or material specifications not approved through change orders, deficiencies in BMP function due to how it was designed or installed and to initiate follow up to replace failed plantings that are under warranty. Once satisfactory results from Assumption inspections are achieved the performance bond(s) are released and the property owner assumes the BMP and becomes responsible for inspection and maintenance tasks. At this stage, documentation of results from Assumption inspections, and records describing the maintenance tasks performed over the establishment or warranty period should be provided by the consultant or municipality to the property owner. The municipality should also receive this information if they are not the inspector or owner and the BMP qualifies for inclusion in their program. There are a variety of approaches to ensuring thorough and satisfactory Assumption inspections of LID BMPs are completed prior to assumption by the property owner but the following contractual and administrative strategies should be considered.  
+
Feedback from inspections should be used to correct any deviations from the approved design or material specifications not approved through change orders, deficiencies in BMP function due to how it was installed and to initiate follow up to replace failed plantings that are under warranty. Once satisfactory results from Assumption inspections are achieved the performance bond(s) are released and the property owner assumes the BMP and becomes responsible for inspection and maintenance tasks. At this stage, documentation of results from Assumption inspections, and records describing the maintenance tasks performed over the establishment or warranty period should be provided by the consultant or municipality to the property owner. The municipality should also receive this information if they are not the inspector or owner and the BMP qualifies for inclusion in their program. There are a variety of approaches to ensuring thorough and satisfactory Assumption inspections of LID BMPs are completed prior to assumption by the property owner but the following contractual and administrative strategies should be considered.  
    
====Performance Bonds, Letters of Credit and Cash Sureties====
 
====Performance Bonds, Letters of Credit and Cash Sureties====
Line 87: Line 89:  
*The property owner can specify in construction tenders or contracts to retain a certain percentage of the total value of the work done for a period of 12 months from the date of final completion.  
 
*The property owner can specify in construction tenders or contracts to retain a certain percentage of the total value of the work done for a period of 12 months from the date of final completion.  
 
**In such cases, construction contracts should specifically require that thorough inspection and testing of the BMPs be completed to the satisfaction of the property owner or their project manager, design consultants and construction contractors as a condition of Assumption, contract termination and release of the holdback amount.<br>
 
**In such cases, construction contracts should specifically require that thorough inspection and testing of the BMPs be completed to the satisfaction of the property owner or their project manager, design consultants and construction contractors as a condition of Assumption, contract termination and release of the holdback amount.<br>
 
+
<br>
    
===Routine Operation Inspections===
 
===Routine Operation Inspections===
Routine Operation inspections should be the responsibility of the property owner or their contractors. At a minimum, Routine Operation inspections should occur annually, but twice annually (in spring and fall seasons) is preferable for vegetated BMPs. More frequent inspections may be warranted for highly visible BMPs, those receiving drainage from high traffic areas (vehicle or pedestrian), or those designed with larger than recommended impervious drainage area to pervious BMP footprint area ratio (i.e., I:P ratio). Feedback from inspections should be used to immediately address routine maintenance needs, schedule structural repairs or further investigations into potential problems with BMP function and to adjust the preset schedule of routine maintenance tasks to optimize the use of program resources.
+
Routine Operation inspections should be the responsibility of the property owner or their contractors. At a minimum, Routine Operation inspections should occur annually, but twice annually (in spring and fall seasons) is preferable for vegetated BMPs. More frequent inspections may be warranted for highly visible BMPs, those receiving drainage from high traffic areas (vehicle or pedestrian), or those designed with larger than recommended impervious drainage area to pervious BMP footprint area ratio (i.e., I:P ratio). Feedback from inspections should be used to immediately address routine maintenance needs, schedule structural repairs or further investigations into potential problems with BMP function and to adjust the preset schedule of routine maintenance tasks to optimize the use of program resources. <br>
 +
<br>
    
===Verification Inspections===
 
===Verification Inspections===
Line 104: Line 107:  
*More frequent Performance Verification inspections may be warranted for BMPs draining to highly sensitive receiving waters or habitat of species at risk. Testing of functional performance (e.g., surface infiltration rate testing, natural or simulated storm event testing, continuous monitoring) is done in addition to Maintenance Verification inspection indicators (i.e., visual indicators and sediment accumulation testing).
 
*More frequent Performance Verification inspections may be warranted for BMPs draining to highly sensitive receiving waters or habitat of species at risk. Testing of functional performance (e.g., surface infiltration rate testing, natural or simulated storm event testing, continuous monitoring) is done in addition to Maintenance Verification inspection indicators (i.e., visual indicators and sediment accumulation testing).
   −
Feedback from inspections should be used to schedule repair or rehabilitation tasks, further investigations into observed problems with BMP function (see Forensic Inspection and Testing section below), or initiate compliance enforcement actions if warranted.
+
Feedback from inspections should be used to schedule repair or rehabilitation tasks, further investigations into observed problems with BMP function (see Forensic Inspection and Testing section below), or initiate compliance enforcement actions if warranted.<br>
 +
<br>
    
===Forensic Inspection and Testing (FIT)===
 
===Forensic Inspection and Testing (FIT)===
Line 120: Line 124:     
==Life Cycle and Inspection==
 
==Life Cycle and Inspection==
- Copy of McMaster Training course and link to the course
+
[[File:50 year life cycle LID BMP.PNG|thumb|530px|The above figure depicts a recommended inspection program for LID BMPs over a 50 year life cycle. (TRCA, 2016).<ref>TRCA. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. Version 1.0. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref>]]
 +
Take a look at McMaster University's new Circular Economy & Climate Change (CE&CC) Program stream. One of the courses offered within the [https://www.mccmcmaster.ca/side Program's Sustainable Infrastructure: Low-Impact Development & Climate Resilience]
   −
[[File:50 year life cycle LID BMP.PNG|700px]]<br>
+
One of the courses is on [https://www.mccmcmaster.ca/silidcr ''"Assessing the costs of your conceptual design and tendered project: Using the LID Life Cycle Costing Tool for Cost Analysis"''] and discusses applying lifecycle assessment and circularity principles to quantify the impact and cost of infrastructure design when compared with traditional impermeable construction approaches.
</br>
+
 
The above figure depicts a recommended inspection program for LID BMPs over a 50 year life cycle. (TRCA, 2016).<ref>TRCA. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. Version 1.0. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref>
+
<pdf width="700" height="650"|thumb>File:LID.CL 2022-23.pdf</pdf>
    
==Practice-specific Inspection and Maintenance==
 
==Practice-specific Inspection and Maintenance==
Line 131: Line 136:  
To read more about recommended inspection, operation, maintenance, repair and rehabilitation tasks and life cycle cost estimates for each type of LID BMP visit the corresponding pages listed here:
 
To read more about recommended inspection, operation, maintenance, repair and rehabilitation tasks and life cycle cost estimates for each type of LID BMP visit the corresponding pages listed here:
   −
*[[Inspection and Maintenance: Bioretention & Dry Swales]]
+
*[[Inspection and Maintenance: Bioretention & Bioswales]]
 
*[[Inspection and Maintenance: Permeable Pavement]]
 
*[[Inspection and Maintenance: Permeable Pavement]]
 
*[[Inspection and Maintenance: Enhanced Swales]]
 
*[[Inspection and Maintenance: Enhanced Swales]]
Line 140: Line 145:     
==Training Requirements==
 
==Training Requirements==
 +
Take a look at the following video which highlights available training offered by STEP (both free and for cost) that are led by conservation authority staff members and industry professionals who possess experience designing, constructing, maintaining and monitoring sustainable technologies in Canada.
 +
 +
Attendees who are Members of [https://www.ieca.org/ IECA], [https://landscapeontario.com/membership-categories Landscape Ontario], and [https://aors.on.ca/ AORS] are eligible for discounts on some courses offered.
 +
 +
To learn more visit: [https://sustainabletechnologies.ca/professional-development-training/ STEP's Professional Development Training site].
   −
(Add - {{ }}) on main site - widgets do not work yet on dev site. #widget:YouTube|id=U0b6g-0K1oM
+
{{#widget:YouTube|id=U0b6g-0K1oM}}
    
==Maintenance, Rehabilitation and Repair==
 
==Maintenance, Rehabilitation and Repair==