==Overview==
 
==Overview==
 
[[File:Infiltration Trench.png|450px|thumb|Images and schematic depicting residential infiltration trenches, commonly referred to as [[soakaways]], that when installed help reduce the risk of flooding and limit negative impacts to stormwater quality.<ref>The City of Windsor. Stormwater Solutions: Infiltration Trenches. https://www.citywindsor.ca/residents/environment/climate-change-adaptation/climate-resilient-home/Documents/Infiltration%20Trench.pdf. Updated 2021. Accessed 30 August, 2021</ref>]]
 
[[File:Infiltration Trench.png|450px|thumb|Images and schematic depicting residential infiltration trenches, commonly referred to as [[soakaways]], that when installed help reduce the risk of flooding and limit negative impacts to stormwater quality.<ref>The City of Windsor. Stormwater Solutions: Infiltration Trenches. https://www.citywindsor.ca/residents/environment/climate-change-adaptation/climate-resilient-home/Documents/Infiltration%20Trench.pdf. Updated 2021. Accessed 30 August, 2021</ref>]]
Infiltration trenches are underground, linear, rectangular or trapezoidal excavations with level or gently sloping bottom grade, geotextile filter fabric on sidewalls and top and filled with clean, crushed angular stone or other void-forming structures. They are well suited to sites where available space for infiltration is limited to strips of land between buildings or properties, or along road rights-of-way. They can also be referred to as infiltration galleries. See [[Perforated Pipe Systems]] fact sheet for guidance on infiltration trench systems integrated with conventional storm sewers that provide both infiltration and conveyance functions.
+
Infiltration trenches are underground, linear, rectangular or trapezoidal excavations with level or gently sloping bottom grade, geotextile filter fabric on sidewalls and top and filled with clean, crushed angular stone or other void-forming structures. They are well suited to sites where available space for infiltration is limited to strips of land between buildings or properties, or along road rights-of-way. They can also be referred to as infiltration galleries. See [[Exfiltration trenches]] fact sheet for guidance on infiltration trench systems integrated with conventional storm sewers that provide both infiltration and conveyance functions.
 
{{textbox|1=Infiltration trenches are an ideal technology for:  
 
{{textbox|1=Infiltration trenches are an ideal technology for:  
 
*Installing below any type of surface or landscape
 
*Installing below any type of surface or landscape
Line 50: Line 50:  
*Plastic chambers usually have a parabolic shape to support the load above. The spaces between rows of plastic pipes or chambers are filled with clear stone to support overlying structures.
 
*Plastic chambers usually have a parabolic shape to support the load above. The spaces between rows of plastic pipes or chambers are filled with clear stone to support overlying structures.
 
*Concrete vaults and plastic crates are often rectangular-shaped. Concrete vault systems can, in some circumstances, be employed without any additional cover. However, a minimum of 20 cm cover is recommended for most applications. Where this cover is planting soil this can support turf grass. Greater planting soil depths are required to support more deeply rooting plants like perennials and shrubs (45 to 60 cm) and trees (85 to 100 cm).
 
*Concrete vaults and plastic crates are often rectangular-shaped. Concrete vault systems can, in some circumstances, be employed without any additional cover. However, a minimum of 20 cm cover is recommended for most applications. Where this cover is planting soil this can support turf grass. Greater planting soil depths are required to support more deeply rooting plants like perennials and shrubs (45 to 60 cm) and trees (85 to 100 cm).
 +
 +
===Infiltration===
 +
For information about constraints to infiltration practices, and approaches and tools for identifying and designing within them see [[Infiltration]].
    
===Native Soil===
 
===Native Soil===
Infiltration trenches, chambers and soakaways can be constructed over any soil type, but hydrologic soil group (HSG) A or B soils are best for achieving water balance and erosion control objectives. Facilities should be located on portions of the site with the highest infiltration rates. Native soil infiltration rate at the proposed facility location and depth should be confirmed through in-situ measurements of hydraulic conductivity under field saturated conditions.  
+
Infiltration trenches, chambers and soakaways can be constructed over any soil type, but hydrologic soil group (HSG) A or B soils are best for achieving water balance and erosion control objectives. Facilities should be located on portions of the site with the highest infiltration rates. Native soil infiltration rate at the proposed facility location and depth should be confirmed through in-situ measurements of hydraulic conductivity under field saturated conditions. For guidance on infiltration testing and selecting a design infiltration rate see [[Design infiltration rate]].
    
===Wellhead Protection===
 
===Wellhead Protection===
Line 78: Line 81:  
Facilities should be setback a minimum of four (4) metres from building foundations.
 
Facilities should be setback a minimum of four (4) metres from building foundations.
   −
For more information on planning considerations and site constraints see [[Site considerations]].
+
 
 +
For a table summarizing information on planning considerations and site constraints see [[Site considerations]].
    
==Design==
 
==Design==
Line 180: Line 184:  
|| Yes || Yes || Yes
 
|| Yes || Yes || Yes
 
|}
 
|}
      
==Materials==
 
==Materials==
Line 206: Line 209:  
Infiltration practice locations should not be used as sediment basins during construction. To prevent sediment from clogging, erosion and sediment controls should remain in place and runoff should be diverted from the infiltration facility until the contributing drainage area is fully stabilized and sediment removal from catch basins, pre-treatment devices and maintenance hole sumps has been completed.   
 
Infiltration practice locations should not be used as sediment basins during construction. To prevent sediment from clogging, erosion and sediment controls should remain in place and runoff should be diverted from the infiltration facility until the contributing drainage area is fully stabilized and sediment removal from catch basins, pre-treatment devices and maintenance hole sumps has been completed.   
   −
===Operation and Maintenance===  
+
==Inspection and Maintenance==  
 
Infiltration trenches, chambers and soakaways will continue to function during winter months if the overflow outlet is located below the local maximum frost penetration depth (i.e. frost line).  
 
Infiltration trenches, chambers and soakaways will continue to function during winter months if the overflow outlet is located below the local maximum frost penetration depth (i.e. frost line).  
   −
Routine inspection and maintenance consists of checking and cleaning trash, debris and sediment from pre-treatment devices, inlets and outlets twice a year in the spring and/or late fall, or when pre-treatment device sump is half full. Use hydro-vac truck to remove sediment from catch basin sumps, OGS and isolated chamber row filter pre-treatment devices.  To clean isolated chamber row filters use a vacuum truck equipped with rear-facing jet nozzle for cleaning large diameter pipes or culverts.  
+
Routine inspection and maintenance consists of checking and cleaning trash, debris and sediment from pre-treatment devices, inlets and outlets twice a year in the spring and/or late fall, or when pretreatment device sump is half full. Use hydro-vac truck to remove sediment from catch basin sumps, OGS and isolated chamber row filter pre-treatment devices.  To clean isolated chamber row filters use a vacuum truck equipped with rear-facing jet nozzle for cleaning large diameter pipes or culverts.  
   −
Monitoring of storage reservoir water level during and after natural or simulated storm events using the monitoring well should be performed periodically to verify the facility drains within the required drainage time (typically 72 hours). Should be performed as part of inspections following construction or major rehabilitation prior to assumption, and every 15 years at a minimum, to track drainage performance over time and determine when replacement is needed.
+
Monitoring of storage reservoir water level during and after natural or simulated storm events using the monitoring well should be performed periodically to verify the facility drains within the required drainage time (typically 72 hours) and/or following every major storm event (>25 mm). Should be performed as part of inspections following construction or major rehabilitation prior to assumption, and every 15 years at a minimum, to track drainage performance over time and determine when replacement is needed.
 +
 
 +
Inspection via a monitoring well should be performed to ensure the facility drains within the maximum acceptable length of time (typically 72 hours) at least
 +
annually and following every major storm event (>25 mm). If the time required to fully drain exceeds 72 hours, drain via pumping and clean out the perforated pipe
 +
underdrain, if present. If slow drainage persists, the system may need removal and replacement of granular material and/or geotextile fabric (PDEP, 2006). The expected lifespan of infiltration practices is not well understood, however, it can be expected that it will vary depending on pretreatment practice maintenance frequency, and the sediment texture and load coming from the catchment.
 +
 
 +
<br>
 +
Take a look at the [[Inspection and Maintenance: Underground Infiltration Systems]] page by clicking below for further details about proper inspection and maintenance practices:
 +
 
 +
{{Clickable button|[[File:Cover page underground.PNG|150 px|link=https://wiki.sustainabletechnologies.ca/wiki/Inspection_and_Maintenance:_Underground_Infiltration_Systems]]}}
       
See also *[[Construction]]
 
See also *[[Construction]]
 +
 +
==Life Cycle Costs==
 +
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Infiltration Trench: Life Cycle Costs]] page to view accurate (found to be within ±14% of actual construction costs<ref>Credit Vally Conservation (CVC). 2019. Life-cycle costing tool 2019 update: sensitivity analysis. Credit Valley Conservation, Mississauga, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/04/LCCT-Sensitivity-Analysis_March2020.pdf</ref>) BMP cost estimates for full- and partial-infiltration design variations. Alternatively you can use the [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)] to generate cost estimates customized to your own LID stormwater design project specifications.
 +
 +
Take a look at the [[Infiltration Trench: Life Cycle Costs]] page by clicking below for further details:
 +
 +
{{Clickable button|[[File:ConstructionTable InfilTrench Full Infil.PNG|150 px|link=https://wiki.sustainabletechnologies.ca/wiki/Infiltration_Trench:_Life_Cycle_Costs]]}}
    
==Gallery==
 
==Gallery==
 
{{:Infiltration trenches: Gallery}}
 
{{:Infiltration trenches: Gallery}}
   −
----
+
==References==