Changes

Jump to navigation Jump to search
Line 33: Line 33:  
==Construction Costs==
 
==Construction Costs==
   −
[[File:ConstructionTable InfilChamb Full Infil.PNG|thumb|left|610px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Retention''']]
+
[[File:ConstructionTable InfilChamb Full Infil 2023.PNG|thumb|center|900px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Retention''']]<br>
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
 
      
<small>'''Note:''' Click on image to enlarge to view associated construction cost estimates.</small><br>
 
<small>'''Note:''' Click on image to enlarge to view associated construction cost estimates.</small><br>
   −
 
+
Above you can find a breakdown of construction costs by expense type.<br>
Above you can find a breakdown of construction costs by expense type:<br>
   
<br>
 
<br>
  −
   
As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs (75%).
 
As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs (75%).
   Line 62: Line 44:  
Below are capital and life cycle cost estimates for the [[Infiltration chambers|infiltration chamber]] design scenario over 25- and 50-year time periods. The estimate of maintenance and rehabilitation (life cycle) cost represents net present values. Operation and maintenance costs are predicted to represent 37% of total life cycle costs over the 25-year evaluation period, and increase to 49% of total life cycle costs over the 50-year period, due to cost associated with removal of sediment from the isolated chamber row pretreatment devices every 8 years.
 
Below are capital and life cycle cost estimates for the [[Infiltration chambers|infiltration chamber]] design scenario over 25- and 50-year time periods. The estimate of maintenance and rehabilitation (life cycle) cost represents net present values. Operation and maintenance costs are predicted to represent 37% of total life cycle costs over the 25-year evaluation period, and increase to 49% of total life cycle costs over the 50-year period, due to cost associated with removal of sediment from the isolated chamber row pretreatment devices every 8 years.
    +
===25-Year life cycle cost break down===
   −
===25-Year life cycle cost break down===
+
[[File:25yr LCCT InfilChamb Full Infil 2023.PNG|thumb|center|900px|'''Infiltration Trench: Full Infiltration''']]<br>
   −
[[File:25yr LCCT InfilChamb Full Infil.PNG|thumb|left|615px|'''Infiltration Trench: Full Infiltration''']]<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
   
<small>'''Note:''' Click on image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on image to enlarge to view associated life cycle cost estimate.</small><br>
 +
</br>
    
===50-Year life cycle cost break down===
 
===50-Year life cycle cost break down===
   −
[[File:50yr LCCT InfilChamb Full Infil.PNG|thumb|left|615px|'''Infiltration Chamber: Full Infiltration''']]<br>
+
[[File:50yr LCCT InfilChamb Full Infil 2023.PNG|thumb|center|900px|'''Infiltration Chamber: Full Infiltration''']]<br>
<br>
+
 
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
  −
<br>
   
<small>'''Note:''' Click on image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on image to enlarge to view associated life cycle cost estimate.</small><br>
    
==Cost Summary Tables==
 
==Cost Summary Tables==
Total life cycle cost estimate for the [Infiltration chambers|infiltration chamber]] on highly permeable native soil design scenario is $120,218.83.<br>
+
Total life cycle cost estimate over the 50 year evaluation period for [[Infiltration chambers|infiltration chamber system]] on highly permeable native soil design scenario is $123,670.89.<br>
    
===Full Infiltration===
 
===Full Infiltration===
[[File:East Gwillimbury.png|800px|thumb|Example of "crate style" [[Infiltration chambers]] being installed in East Gwillimbury. Photo credit: [https://www.makeway.ca/products/stormwater-management-systems/ Make-Way Environmental Technologies Inc.]]
+
[[File:East Gwillimbury.png|400px|thumb|Example of "crate style" [[Infiltration chambers]] being installed in East Gwillimbury. Photo credit: [https://www.makeway.ca/products/stormwater-management-systems/ Make-Way Environmental Technologies Inc.]]
   −
[[File:Design Table InfilChamb Full Infil.PNG|700px]]<br>
+
[[File:Design Table InfilChamb Full Infil 2023.PNG|830px]]<br>
 
</br>
 
</br>
 
</br>
 
</br>
    
==References==
 
==References==

Navigation menu