Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:  
__NOTOC__
 
__NOTOC__
 +
<imagemap>
 +
Image:Infiltration.png|thumb|700 px|This is an image map; clicking on components will load the appropriate article.
 +
poly 315 507 208 555 317 605 423 555 [[Drainage time]]
 +
rect 210 658 426 730 [[Details]]
 +
rect 568 522 728 594 [[Underdrain]]
 +
poly 73 27 39 75 75 126 179 126 215 78 181 27 [[Infiltration]]
 +
poly 268 25 235 75 270 123 364 124 395 76 365 25 [[Infiltration: Testing]] 
 +
rect 237 185 397 225 [[Select BMP type]]
 +
rect 238 266 397 329 [[Bioretention: Sizing]]
 +
</imagemap>
 
{{textbox|
 
{{textbox|
 
{{plainlist|
 
{{plainlist|
Line 14: Line 24:  
#The minimum total depth may be limited by the need to support vegetation i.e. not < 0.6 m.
 
#The minimum total depth may be limited by the need to support vegetation i.e. not < 0.6 m.
 
#[[Green roofs]], [[absorbent landscapes]] and [[permeable paving]] often receive very little flow from other surfaces, so that the I/P ratio is close to 1.
 
#[[Green roofs]], [[absorbent landscapes]] and [[permeable paving]] often receive very little flow from other surfaces, so that the I/P ratio is close to 1.
#[[Infiltration trenches]], [[Infiltration chambers| chambers]] and [[bioretention cells]] have a maximum recommended I/P ratio of 20.
+
#[[Infiltration trenches]], [[Infiltration chambers| chambers]] and [[bioretention]] have a maximum recommended I/P ratio of 20.
    
{|class="wikitable"
 
{|class="wikitable"
Line 44: Line 54:     
==To calculate the required depth, where the area of the facility is constrained (3D)==
 
==To calculate the required depth, where the area of the facility is constrained (3D)==
To calculate the required depth:
+
In some very constrained sites, the surface area of the BMP may be limited, in this case the required depth of cell or trench can be calculated:
 
:<math>d=a[e^{\left ( -bD \right )} -1]</math>
 
:<math>d=a[e^{\left ( -bD \right )} -1]</math>
 
Where
 
Where
Line 50: Line 60:  
and  
 
and  
 
<math>b=\frac{xq}{nP}</math>
 
<math>b=\frac{xq}{nP}</math>
 +
 +
(The rearrangement to calculate the required footprint area of the facility for a given depth using three dimensions of underground infiltration is not available at this time. Elegant submissions are invited.)
 +
 
==To calculate the required depth, where the area of the facility is constrained (1D)==
 
==To calculate the required depth, where the area of the facility is constrained (1D)==
<math>d=\frac{D\left[\left( \frac{I}{P} \right )i-q \right]}{n}</math>
+
In some very constrained sites, the surface area of the BMP may be limited, in this case the required depth of cell or trench can be calculated.
 +
Note that in most cases the results of this calculation will be very similar to those of the above equation using 3D infiltration.
 +
:<math>d=\frac{D\left[\left( \frac{I}{P} \right )i-q \right]}{n}</math>
    
==To calculate the require facility area or footprint where the depth is constrained (1D)==
 
==To calculate the require facility area or footprint where the depth is constrained (1D)==
 +
In many locations throughout Ontario, there may be limited depth of soil available into which stormwater may be infiltrated. In this case the required storage needs to be distributed more widely across the landscape. The overall are of BMP required can be calculated:
 
<math>P=\frac{IiD}{nd+qD}</math>
 
<math>P=\frac{IiD}{nd+qD}</math>
  −
(The rearrangement to calculate the required footprint area of the facility for a given depth using three dimensions of underground infiltration is not available at this time. Elegant submissions are invited.)
      
==Time for infiltration of surface ponded water==
 
==Time for infiltration of surface ponded water==
Line 62: Line 76:  
It is best applied to calculate the limited duration ponding on the surface of [[bioretention cells]], [[bioswales]] and [[enhanced grass swales]].  
 
It is best applied to calculate the limited duration ponding on the surface of [[bioretention cells]], [[bioswales]] and [[enhanced grass swales]].  
 
To calculate the time (''t'') to fully drain the facility through the footprint area only:  
 
To calculate the time (''t'') to fully drain the facility through the footprint area only:  
<math>t=\frac{nd}{K}</math>
+
<math>t=\frac{d}{K}</math>
    
==Drawdown time to empty facility==
 
==Drawdown time to empty facility==
8,255

edits

Navigation menu