Changes

Jump to navigation Jump to search
no edit summary
Line 50: Line 50:  
and  
 
and  
 
<math>b=\frac{xq}{nP}</math>
 
<math>b=\frac{xq}{nP}</math>
 +
 +
(The rearrangement to calculate the required footprint area of the facility for a given depth using three dimensions of underground infiltration is not available at this time. Elegant submissions are invited.)
    
==To calculate the required depth, where the area of the facility is constrained (1D)==
 
==To calculate the required depth, where the area of the facility is constrained (1D)==
Line 59: Line 61:  
In many locations throughout Ontario, there may be limited depth of soil available into which stormwater may be infiltrated. In this case the required storage needs to be distributed more widely across the landscape. The overall are of BMP required can be calculated:
 
In many locations throughout Ontario, there may be limited depth of soil available into which stormwater may be infiltrated. In this case the required storage needs to be distributed more widely across the landscape. The overall are of BMP required can be calculated:
 
<math>P=\frac{IiD}{nd+qD}</math>
 
<math>P=\frac{IiD}{nd+qD}</math>
  −
(The rearrangement to calculate the required footprint area of the facility for a given depth using three dimensions of underground infiltration is not available at this time. Elegant submissions are invited.)
      
==Time for infiltration of surface ponded water==
 
==Time for infiltration of surface ponded water==
8,255

edits

Navigation menu