Changes

Jump to navigation Jump to search
no edit summary
Line 44: Line 44:     
==To calculate the required depth, where the area of the facility is constrained (3D)==
 
==To calculate the required depth, where the area of the facility is constrained (3D)==
[[file:Hydraulic radius.png|thumb|Three footprint areas of 9 m<sup>2</sup>.<br>
  −
From left to right x = 12 m, x = 14 m, and x = 16 m]]
  −
For some geometries (e.g. particularly deep facilities or linear facilities), it may be preferred to also account for lateral infiltration.
  −
The 3 dimensional equations make use of the hydraulic radius (''P''/''x''), where ''x'' is the perimeter (m) of the facility. <br>
  −
Maximizing the perimeter of the facility directs designers towards longer, linear shapes such as [[infiltration trenches]] and [[bioswales]]. 
   
To calculate the required depth:
 
To calculate the required depth:
 
:<math>d=a[e^{\left ( -bD \right )} -1]</math>
 
:<math>d=a[e^{\left ( -bD \right )} -1]</math>
Line 70: Line 65:     
==Drawdown time to empty facility==
 
==Drawdown time to empty facility==
The design of infiltration facilities should be checked for [[drawdown time]]. The target drawdown time for the internal storage of an infiltration facility is between 48-72 hours. <br>
+
[[file:Hydraulic radius.png|thumb|Three footprint areas of 9 m<sup>2</sup>.<br>
 +
From left to right x = 12 m, x = 14 m, and x = 16 m]]
 +
The target [[drawdown time]] for the internal storage of an infiltration facility is between 48-72 hours. <br>
 +
For some geometries (e.g. particularly deep facilities or linear facilities), it preferable to account for lateral infiltration.
 +
The 3D equation make use of the hydraulic radius (''P''/''x''), where ''x'' is the perimeter (m) of the facility. <br>
 +
'''Maximizing the perimeter of the facility directs designers towards longer, linear shapes such as [[infiltration trenches]] and [[bioswales]].''' 
 
To calculate the time (''t'') to fully drain the facility:  
 
To calculate the time (''t'') to fully drain the facility:  
 
<math>t=\frac{nP}{qx}ln\left [ \frac{\left (d+ \frac{P}{x} \right )}{\left(\frac{P}{x}\right)}\right]</math>
 
<math>t=\frac{nP}{qx}ln\left [ \frac{\left (d+ \frac{P}{x} \right )}{\left(\frac{P}{x}\right)}\right]</math>
8,255

edits

Navigation menu