Changes

Jump to navigation Jump to search
Line 37: Line 37:       −
Above you can find a breakdown of construction costs by expense type for the 2,000 m2, 4 inch deep pre-grown sedum mat green roof design configuration.<br>
+
Above you can find a breakdown of construction costs by expense type for the 2,000 m<sup>2</sup>, 4 inch deep pre-grown sedum mat green roof design configuration.<br>
    
Material & Installation expenses represent the largest portion of total construction costs (85%).
 
Material & Installation expenses represent the largest portion of total construction costs (85%).

Navigation menu