Changes

Jump to navigation Jump to search
m
no edit summary
Line 15: Line 15:  
|Thickness (mm)||If topsoil has been amended [[Absorbent landscapes]]
 
|Thickness (mm)||If topsoil has been amended [[Absorbent landscapes]]
 
|-
 
|-
|Porosity (fraction)||Suggest range 0.35 – 0.4, unless otherwise tested
+
|Porosity (fraction)||Suggest around 0.4, unless otherwise tested.
 
|-
 
|-
 
|Field capacity (fraction)||Rowspan=5|Will vary according to native or amended topsoil<ref> Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt Accessed August 23, 2017.</ref>
 
|Field capacity (fraction)||Rowspan=5|Will vary according to native or amended topsoil<ref> Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt Accessed August 23, 2017.</ref>
Line 29: Line 29:  
|Design drawdown time (hrs)||Will be determined by regulatory authority, often 48 - 72 hours to reduce nuisance from [[Wildlife#Mosquitoes|mosquitoes]]
 
|Design drawdown time (hrs)||Will be determined by regulatory authority, often 48 - 72 hours to reduce nuisance from [[Wildlife#Mosquitoes|mosquitoes]]
 
|}
 
|}
[[category:modelling]]
+
[[category:modeling]]
8,255

edits

Navigation menu