===Water Balance===
 
===Water Balance===
Recent research indicates that a conservative runoff reduction rate of 10 to 20% can be used depending on whether soils fall in [[Soil groups| hydrologic soil groups A/B or C/D,]] respectively. The runoff reduction rates can be doubled if the native soils on which the swale is located have been tilled to a depth of 300 mm and amended with compost to achieve an organic content of between 8 and 15% by weight or 30 to 40% by volume. The mai ncontributing factors that influence runoff reduction rates for swales are:   
+
Recent research indicates that a conservative runoff reduction rate of 10 to 20% can be used depending on whether soils fall in [[Soil groups| hydrologic soil groups A/B or C/D,]] respectively. The runoff reduction rates can be doubled if the native soils on which the swale is located have been tilled to a depth of 300 mm and amended with compost to achieve an organic content of between 8 and 15% by weight or 30 to 40% by volume. The main contributing factors that influence runoff reduction rates for swales are:   
 
* Native [[Soil groups|soil]] types
 
* Native [[Soil groups|soil]] types
 
* [[Grading|Slope]]
 
* [[Grading|Slope]]
Line 293: Line 293:     
==Life Cycle Costs==
 
==Life Cycle Costs==
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Enhanced Swales: Life Cycle Costs]] page to view accurate BMP cost estimates and learn to plan your own LID-based project budget with [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)].
+
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Enhanced Swales: Life Cycle Costs]] page to view a cost estimate.  Alternatively you can use the [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)] to generate cost estimates customized to your own LID stormwater design project specifications.
    
Take a look at the [[Enhanced Swales: Life Cycle Costs]] page by clicking below for further details:
 
Take a look at the [[Enhanced Swales: Life Cycle Costs]] page by clicking below for further details: