* Native soil infiltration rate for Full Infiltration Design scenario was assumed to be 20 mm/h, and a safety factor of 2.5 was applied to calculate the design infiltration rate.
 
* Native soil infiltration rate for Full Infiltration Design scenario was assumed to be 20 mm/h, and a safety factor of 2.5 was applied to calculate the design infiltration rate.
 
* Ditch inlet catch basin structure located at furthest downgradient end, with connection to storm sewer pipe, included as the outlet.  
 
* Ditch inlet catch basin structure located at furthest downgradient end, with connection to storm sewer pipe, included as the outlet.  
* Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from outlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing.
+
* Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from curb inlets and outlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing.
 
* Impervious drainage area to pervious swale footprint area of 10:1 (tool default value).
 
* Impervious drainage area to pervious swale footprint area of 10:1 (tool default value).
 
* Designed with a trapezoidal cross section with a top width of 4.75 m, bottom width of 0.75 m, and 2.5:1 side slopes (tool default values).
 
* Designed with a trapezoidal cross section with a top width of 4.75 m, bottom width of 0.75 m, and 2.5:1 side slopes (tool default values).
Line 36: Line 36:  
==Construction Costs==
 
==Construction Costs==
   −
[[File:Construction Breakdown EnhancedSwales Full Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]
+
[[File:Construction Breakdown EnhancedSwales Full Infil 2023.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]
      Line 52: Line 52:  
===25-Year life cycle cost break down===
 
===25-Year life cycle cost break down===
   −
[[File:25yr LCCT EnhancedSwales Full Infil.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']]
+
[[File:25yr LCCT EnhancedSwales Full Infil 2023.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']]
    
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 +
</br>
    
===50-Year life cycle cost break down===
 
===50-Year life cycle cost break down===
   −
[[File:50yr LCCT EnhancedSwales Full Infil.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']]
+
[[File:50yr LCCT EnhancedSwales Full Infil 2023.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']]
    
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 +
</br>
    
==Cost Summary Tables==
 
==Cost Summary Tables==
Line 66: Line 68:     
===Full Infiltration===
 
===Full Infiltration===
[[File:CVC Office, Grass Swale.JPG|500px|thumb|Enhanced Grass [[swale]] in CVC headquarters parking lot, Mississauga ON.]]
+
[[File:CVC Office, Grass Swale.JPG|650px|thumb|Enhanced Grass [[swale]] in CVC headquarters parking lot, Mississauga ON.]]
   −
[[File:Design Table EnhancedSwales Full Infil.PNG|700px]]<br>
+
[[File:Design Table EnhancedSwales Full Infil 2023.PNG|700px]]<br>
 