Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations:
 
Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations:
* Native soil infiltration rate for Full Infiltration Design scenario was assumed to be 20 mm/h, and a safety factor of 2.5 was applied to calculate the design infiltration rate.  
+
* Native soil infiltration rate for Full Infiltration Design scenario was assumed to be 20 mm/h, and a safety factor of 2.5 was applied to calculate the design infiltration rate.
* Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from outlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing.
+
* Ditch inlet catch basin structure located at furthest downgradient end, with connection to storm sewer pipe, included as the outlet.  
 +
* Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from curb inlets and outlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing.
 
* Impervious drainage area to pervious swale footprint area of 10:1 (tool default value).
 
* Impervious drainage area to pervious swale footprint area of 10:1 (tool default value).
 
* Designed with a trapezoidal cross section with a top width of 4.75 m, bottom width of 0.75 m, and 2.5:1 side slopes (tool default values).
 
* Designed with a trapezoidal cross section with a top width of 4.75 m, bottom width of 0.75 m, and 2.5:1 side slopes (tool default values).
Line 22: Line 23:     
===Notes===
 
===Notes===
* Designs include [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]].
+
* Design includes [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]].
 
* Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation.
 
* Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation.
  −
  −
* The Tool assumes an in-line system.
  −
* The Tool assumed curb-and-gutter around the circumference of the facility with curb-cut inlets every 6 to 0.5 meter squared and stone splash pads.
  −
* The greater the slope, the more check dams placed by the Tool. The unit cost for check dams is for the amount of material required, not number of dams.
  −
* If configuration include driveway (2 laned), a culvert pipe connects the enhanced grass swale (EGS) and an extra 0.1m of gravel is added beneath culvert.
  −
* Swales which cross multiple driveways or smaller driveways can be accounted for by multiplying or dividing these costs in the "Additional Costs" cells.
   
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
Line 42: Line 36:  
==Construction Costs==
 
==Construction Costs==
   −
[[File:Construction Breakdown EnhancedSwales Full Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]
+
[[File:Construction Breakdown EnhancedSwales Full Infil 2023.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]
      Line 48: Line 42:       −
Above you can find a cost breakdown of a 1000m<sup>2</sup> LID configuration:<br>
+
Above you can find a breakdown of construction costs by expense type for a 200 m<sup>2</sup> surface area facility (I:P area ratio of 10:1):<br>
 
#[[Enhanced swales|Enhanced Swales: Full Infiltration]]  
 
#[[Enhanced swales|Enhanced Swales: Full Infiltration]]  
   −
Material & Installation expenses represent the largest portion of total construction costs (50%).
+
Material & Installation expenses represent the largest portion of total construction costs (55%).
    
==Life Cycle Costs==
 
==Life Cycle Costs==
Below are capital and life cycle cost estimates for the [[Enhanced swales]] Full Infiltration configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 45% of total life cycle costs over the 25-year evaluation period, and increase to 59% of total life cycle costs over the 50-year period, due to increased levels of litter removal, watering (establishment period - years 1 & 2 / annually and / drought watering) cleaning out and vacuuming of the catchbasin, mowing, replacement of sod, weeding and pruning of the BMP's planted [[vegetation]].
+
Below are capital and life cycle cost estimates for the [[Enhanced swales]] Full Infiltration configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 39% of total life cycle costs over the 25-year evaluation period, and increase to 54% of total life cycle costs over the 50-year period, due to swale surface rehabilitation costs assumed to be required after 25 years of operation.
    
===25-Year life cycle cost break down===
 
===25-Year life cycle cost break down===
   −
[[File:25yr LCCT EnhancedSwales Full Infil.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']]
+
[[File:25yr LCCT EnhancedSwales Full Infil 2023.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']]
    
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 +
</br>
    
===50-Year life cycle cost break down===
 
===50-Year life cycle cost break down===
   −
[[File:50yr LCCT EnhancedSwales Full Infil.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']]
+
[[File:50yr LCCT EnhancedSwales Full Infil 2023.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']]
    
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
 +
</br>
    
==Cost Summary Tables==
 
==Cost Summary Tables==
Total life cycle cost estimates for the [[Enhanced swale]] Full Infiltration design configuration is ($23,451.36), makign it one of the cheapest LID BMP options.<br>
+
Total life cycle cost estimate over the 50 year evaluation period for the [[Enhanced swale]] Full Infiltration design configuration is ($65,021.40), making it one of the cheapest LID BMP options.<br>
    
===Full Infiltration===
 
===Full Infiltration===
[[File:CVC Office, Grass Swale.JPG|500px|thumb|Enhanced Grass [[swale]] in CVC headquarters parking lot, Mississauga ON.]]
+
[[File:CVC Office, Grass Swale.JPG|650px|thumb|Enhanced Grass [[swale]] in CVC headquarters parking lot, Mississauga ON.]]
   −
[[File:Design Table EnhancedSwales Full Infil.PNG|700px]]<br>
+
[[File:Design Table EnhancedSwales Full Infil 2023.PNG|700px]]<br>
 