Changes

Jump to navigation Jump to search
m
no edit summary
Line 9: Line 9:  
*[[Natural drainage]]
 
*[[Natural drainage]]
   −
 
+
LID BMPs are like a toolbox from which engineers can pick and choose depending on site constraints. But this has to come after a larger scale planning strategy to manage water and other ecosystem spaces.  
*[http://gifmod.com/worked-examples/]
      
==Selection of suite of LIDs: the Treatment Train Tool==
 
==Selection of suite of LIDs: the Treatment Train Tool==
Line 17: Line 16:     
STEP have developed the [http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/ Low Impact Development Treatment Train Tool] to help developers, consultants, municipalities and landowners understand and implement sustainable stormwater management planning and design practices.
 
STEP have developed the [http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/ Low Impact Development Treatment Train Tool] to help developers, consultants, municipalities and landowners understand and implement sustainable stormwater management planning and design practices.
  −
  −
Interested in water quality?
  −
*[[Water quality]]
  −
  −
Get on board with the [[treatment train tool]].
      
Mathematical [[notation]] used throughout the site.
 
Mathematical [[notation]] used throughout the site.
8,255

edits

Navigation menu