Changes

Jump to navigation Jump to search
m
Line 20: Line 20:  
The bottom of a dry pond should be flat to encourage uniform ponding and infiltration across the entire surface. Recommended tolerance on base levels 10 mm in 3m.  
 
The bottom of a dry pond should be flat to encourage uniform ponding and infiltration across the entire surface. Recommended tolerance on base levels 10 mm in 3m.  
   −
The side slopes should be no steeper than 1:3 to permit vegetation stabilization and access for maintenance and amenity. This may be relaxed where the pond area is very shallow (0.5 m). stepped or benched slopes are also a possibility, but consideration should be made of maintenance access. <ref>Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. (2015). The SuDS Manual. London.</ref>     
+
The side slopes should be no steeper than 1:3 to permit vegetation stabilization and access for maintenance and amenity. This may be relaxed where the pond area is very shallow (0.5 m). stepped or benched slopes are also a possibility, but consideration should be made of maintenance access. <ref name=Ballard>Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. (2015). The SuDS Manual. London.</ref>     
    
===Volume===
 
===Volume===
Line 33: Line 33:  
===Outlet===
 
===Outlet===
 
Detention time
 
Detention time
A detention time of 24 hours should be targeted in all instances. Where this necessaitates a very low outflow, a [[Flow control#Vo|vortex valve or similar is recommended over an orifice or pipe restiction. The detention time is approximated by the drawdown time.
+
A detention time of 24 hours should be targeted in all instances. Where this necessaitates a very low outflow, a [[Flow control#Vortex valve|vortex valve]] or similar is recommended over an orifice or pipe restiction. The detention time is approximated by the drawdown time.
    
The drawdown time in the pond can be estimated using Equation 4.10. Equation 4.10 is the classic falling head orifice equation which assumes a constant pond surface area. This assumption is generally not valid, and a more accurate estimation can be made if Equation 4.10 is solved as a differential equation. This is easily done if the relationship between pond surface area and pond depth is approximated using a linear regression.
 
The drawdown time in the pond can be estimated using Equation 4.10. Equation 4.10 is the classic falling head orifice equation which assumes a constant pond surface area. This assumption is generally not valid, and a more accurate estimation can be made if Equation 4.10 is solved as a differential equation. This is easily done if the relationship between pond surface area and pond depth is approximated using a linear regression.
8,255

edits

Navigation menu