The following, comprehensive list is presented as a basis for discussion between regulatory authorities and design practitioners.
 +
{{TOClimit|2}}
 
==Site Description==
 
==Site Description==
 
* Location (key plan, municipal address, nearest roads, watershed and subwatershed);
 
* Location (key plan, municipal address, nearest roads, watershed and subwatershed);
Line 9: Line 11:  
==Background Information==
 
==Background Information==
 
* Pre-submission meeting verification;
 
* Pre-submission meeting verification;
* Reports from pre-consultation with MOECC and other agencies (especially related LID credits);
+
* Reports from pre-consultation with MOECP and other agencies (especially related LID credits);
 
* Watershed plans;
 
* Watershed plans;
 
* Sub-Watershed plans;
 
* Sub-Watershed plans;
Line 19: Line 21:  
==Figures and drawings==
 
==Figures and drawings==
 
* Location plan in the report;
 
* Location plan in the report;
* Key Plan on the drawings;
+
* Key plan on the drawings;
 
* All watercourses and names of watercourses shown on all figures and drawings;
 
* All watercourses and names of watercourses shown on all figures and drawings;
 
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
 
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
Line 29: Line 31:  
**100 year capture;
 
**100 year capture;
 
**Site outlets; and
 
**Site outlets; and
**SWM facility location and associated tributary areas;
+
**LID facility location and associated tributary areas;
 
* Model schematics;
 
* Model schematics;
* Storm drainage, grading and general servicing plans;
+
* Storm drainage, [[grading]] and general servicing plans;
* SWM facility design drawings and details;
+
* LID practice design [[drawings]] and details;
* Erosion and sediment control plans;
+
* [https://sustainabletechnologies.ca/home/erosion-and-sediment-control/ Erosion and sediment control plans];
 +
 
 +
{| class="wikitable sortable"
 +
! Parameter
 +
! Plan
 +
! Detail
 +
! Profile
 +
! Description
 +
|-
 +
| Location
 +
| x
 +
|
 +
|
 +
| Area extent shown on plan view (bump-outs, municipal reserves, private lots, parks)
 +
|-
 +
| Surface area
 +
| x
 +
|
 +
|
 +
| Outlined on plan view drawings and stated in report
 +
|-
 +
| Inlet
 +
| x
 +
| x
 +
|
 +
| shown on plan view and typical details provided ([[curb cuts]], [[level spreader|flow spreader]], ribbon curb)
 +
|-
 +
| Materials
 +
|
 +
| x
 +
|
 +
| Materials specs (soil, drainage layer), depth, hydraulic conductivity, porosity
 +
|-
 +
| Vegetation
 +
| x
 +
| x
 +
|
 +
| Planting plan and [[vegetation]] details (species, mature density, succession plan)
 +
|-
 +
| Outlet
 +
| x
 +
| x
 +
| x
 +
| [[Underdrain]] spec and slope, spill elevation, catch basin type and grate, [[weir]] type and location, [[inlet]] control device details
 +
|-
 +
| Catchment
 +
| x
 +
|
 +
|
 +
| Delineated catchment area directed to [[bioretention]] facility
 +
|-
 +
| Subsurface materials
 +
|
 +
| x
 +
|
 +
| Layer order (filter, [[reservoir aggregate|reservoir]], [[choker course]], [[geotextiles]] (if using)) and specifications (gradation, hydraulic conductivity, void space)
 +
|-
 +
| Depth
 +
|
 +
| x
 +
| x
 +
| Depth of each layer, reservoir retention depth (if applicable), surface ponding depth (if applicable)
 +
|-
 +
| Slope
 +
|
 +
| x
 +
| x
 +
| Sub-base slope and surface slope
 +
|-
 +
| Flow Arrows
 +
|
 +
| x
 +
|
 +
| From contributing area and overflow route
 +
|-
 +
| Water depth
 +
|
 +
| x
 +
|
 +
| Ponding depth and water surface elevation during design storm and maximum prior to [[overflow]]
 +
|-
 +
| Inundation
 +
|
 +
| x
 +
|
 +
| Extent of of inundation during design storms
 +
|-
 +
| Erosion control
 +
| x
 +
| x
 +
|
 +
| Located at inlet, outlet if overland spill
 +
|}
 +
 
 
==Design Information==
 
==Design Information==
 
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
 
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
 
* Supporting information has been included for all modelling parameters and calculations.
 
* Supporting information has been included for all modelling parameters and calculations.
*Stage-Storage-Discharge calculations provided for each SWM facility including design information on control and emergency overflow weirs.
+
*Stage-Storage-Discharge calculations provided for each LID facility including design information on control and emergency overflow weirs.
 
*Flow and storage summary tables provided which reference the associated drainage area, catchment ID, outlet(s) and differentiate between controlled and uncontrolled areas.
 
*Flow and storage summary tables provided which reference the associated drainage area, catchment ID, outlet(s) and differentiate between controlled and uncontrolled areas.
 
*Identify and show seasonal high groundwater levels in report and on drawings;
 
*Identify and show seasonal high groundwater levels in report and on drawings;
*Per MOECC SWM manual, 2003 (i.e. Drainage area, required volume, slopes, forebay, etc.);
+
*Per [https://www.ontario.ca/document/stormwater-management-planning-and-design-manual-0 MOECC SWM manual, 2003] (i.e. Drainage area, required volume, slopes, forebay, etc.);
 
*The SWM report and drawings are to include a table summarizing required storage, provided storage and associated elevation and flow for the permanent pool, 25mm (extended detention), and 2 through 100 year return period storm events where applicable for each facility;
 
*The SWM report and drawings are to include a table summarizing required storage, provided storage and associated elevation and flow for the permanent pool, 25mm (extended detention), and 2 through 100 year return period storm events where applicable for each facility;
*An operations and maintenance manual should be included in the SWM Report for all LID facilities in accordance with municipal requirements;
+
*An operations and maintenance manual (includings a maintenance schedule) should be included in the SWM Report for all LID facilities in accordance with municipal requirements;
*Complete information on proposed manufactured treatment devices is to be provided including current status under ETV protocols;
+
*Complete information on proposed manufactured treatment devices is to be provided including current status under [[Pretreatment#Concentrated underground flow|ETV protocols]];
*An operations and maintenance manual is to be provided that includes a maintenance schedule;
+
===Quantity control===
===Quantity Control Section===
   
*Runoff coefficient or imperviousness calculations;
 
*Runoff coefficient or imperviousness calculations;
 
*Analysis using appropriate storm distributions;
 
*Analysis using appropriate storm distributions;
*Pre-development peak flow (m<sup>3</sup>/s);
+
*Pre-development peak flow (/s);
*Post-development uncontrolled peak flow (m<sup>3</sup>/s);
+
*Post-development uncontrolled peak flow (/s);
*Post-development controlled peak flow (m<sup>3</sup>/s);
+
*Post-development controlled peak flow (/s);
 
*LID Facility Type;
 
*LID Facility Type;
 
*Stage – Storage – Discharge Table;
 
*Stage – Storage – Discharge Table;
Line 59: Line 153:  
*Overland flow conveyance and design;
 
*Overland flow conveyance and design;
 
*External drainage conveyance (100 year and Regional);
 
*External drainage conveyance (100 year and Regional);
2.2. Quality Control Section
+
===Quality control===
Level of Protection.
+
*Level of protection;
Drainage Area to Facility in hectares.
+
*Drainage area to facility in hectares;
Percentage Impervious – total and directly connected areas.
+
*Percentage impervious – total and directly connected areas;
SWM Facility Monitoring and Maintenance Requirements.
+
*SWM facility monitoring and maintenance requirements;
3. Hazard Land Management
+
 
Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings.
+
==Hazard land management==
Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only).
+
*Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings;
Wetlands and required setbacks determined and identified on plans.
+
*Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only);
Meanderbelt assessment and/or setback determined and identified on plans.
+
*Wetlands and required setbacks determined and identified on plans;
Wave uprush and/or wind setup elevations calculated (Lake Simcoe Shoreline).
+
*Meanderbelt assessment and/or setback determined and identified on plans;
“Limit of development” shown on plans.
+
*Wave uprush and/or wind setup elevations calculated;
Survey and floodplain mapping submitted (As per minimum requirement in Appendix K).
+
*“Limit of development” shown on plans;
Hydraulic modelling and analysis including digital files (As per minimum requirements identified in Appendices C, I and K).
+
*Survey and floodplain mapping submitted (see below);
4. Other
+
*Hydraulic modelling and analysis including digital files;
Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format.
+
==Other==
 +
*Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format;
 
----
 
----
 