==Floodplain Mapping and Documentation Minimum Requirements==
+
The following, comprehensive list is presented as a basis for discussion between regulatory authorities and design practitioners.
 +
{{TOClimit|2}}
 +
==Site Description==
 +
* Location (key plan, municipal address, nearest roads, watershed and subwatershed);
 +
* Existing Conditions (land use on site and surrounding areas);
 +
* Natural Heritage features;
 +
* Proposed Conditions;
 +
* Drainage Area (for the site, tributary and watershed);
 +
* Watercourses, wetlands present on site, and type (permanent or intermittent);
 +
* Drainage patterns and ultimate drainage location/outfall;
 +
==Background Information==
 +
* Pre-submission meeting verification;
 +
* Reports from pre-consultation with MOECP and other agencies (especially related LID credits);
 +
* Watershed plans;
 +
* Sub-Watershed plans;
 +
* Master drainage plans (MDPs);
 +
* Other previous reports and relevant SWM requirements;
 +
* Existing models;
 +
* Geotechnical report;
 +
* Hydrogeological report;
 +
==Figures and drawings==
 +
* Location plan in the report;
 +
* Key plan on the drawings;
 +
* All watercourses and names of watercourses shown on all figures and drawings;
 +
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
 +
**Existing contours;
 +
**Drainage direction (minor and major system);
 +
**Catchments ID's;
 +
**Areas and imperviousness;
 +
**Uncontrolled areas;
 +
**100 year capture;
 +
**Site outlets; and
 +
**LID facility location and associated tributary areas;
 +
* Model schematics;
 +
* Storm drainage, [[grading]] and general servicing plans;
 +
* LID practice design [[drawings]] and details;
 +
* [https://sustainabletechnologies.ca/home/erosion-and-sediment-control/ Erosion and sediment control plans];
 +
 
 +
{| class="wikitable sortable"
 +
! Parameter
 +
! Plan
 +
! Detail
 +
! Profile
 +
! Description
 +
|-
 +
| Location
 +
| x
 +
|
 +
|
 +
| Area extent shown on plan view (bump-outs, municipal reserves, private lots, parks)
 +
|-
 +
| Surface area
 +
| x
 +
|
 +
|
 +
| Outlined on plan view drawings and stated in report
 +
|-
 +
| Inlet
 +
| x
 +
| x
 +
|
 +
| shown on plan view and typical details provided ([[curb cuts]], [[level spreader|flow spreader]], ribbon curb)
 +
|-
 +
| Materials
 +
|
 +
| x
 +
|
 +
| Materials specs (soil, drainage layer), depth, hydraulic conductivity, porosity
 +
|-
 +
| Vegetation
 +
| x
 +
| x
 +
|
 +
| Planting plan and [[vegetation]] details (species, mature density, succession plan)
 +
|-
 +
| Outlet
 +
| x
 +
| x
 +
| x
 +
| [[Underdrain]] spec and slope, spill elevation, catch basin type and grate, [[weir]] type and location, [[inlet]] control device details
 +
|-
 +
| Catchment
 +
| x
 +
|
 +
|
 +
| Delineated catchment area directed to [[bioretention]] facility
 +
|-
 +
| Subsurface materials
 +
|
 +
| x
 +
|
 +
| Layer order (filter, [[reservoir aggregate|reservoir]], [[choker course]], [[geotextiles]] (if using)) and specifications (gradation, hydraulic conductivity, void space)
 +
|-
 +
| Depth
 +
|
 +
| x
 +
| x
 +
| Depth of each layer, reservoir retention depth (if applicable), surface ponding depth (if applicable)
 +
|-
 +
| Slope
 +
|
 +
| x
 +
| x
 +
| Sub-base slope and surface slope
 +
|-
 +
| Flow Arrows
 +
|
 +
| x
 +
|
 +
| From contributing area and overflow route
 +
|-
 +
| Water depth
 +
|
 +
| x
 +
|
 +
| Ponding depth and water surface elevation during design storm and maximum prior to [[overflow]]
 +
|-
 +
| Inundation
 +
|
 +
| x
 +
|
 +
| Extent of of inundation during design storms
 +
|-
 +
| Erosion control
 +
| x
 +
| x
 +
|
 +
| Located at inlet, outlet if overland spill
 +
|}
 +
 
 +
==Design Information==
 +
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
 +
* Supporting information has been included for all modelling parameters and calculations.
 +
*Stage-Storage-Discharge calculations provided for each LID facility including design information on control and emergency overflow weirs.
 +
*Flow and storage summary tables provided which reference the associated drainage area, catchment ID, outlet(s) and differentiate between controlled and uncontrolled areas.
 +
*Identify and show seasonal high groundwater levels in report and on drawings;
 +
*Per [https://www.ontario.ca/document/stormwater-management-planning-and-design-manual-0 MOECC SWM manual, 2003] (i.e. Drainage area, required volume, slopes, forebay, etc.);
 +
*The SWM report and drawings are to include a table summarizing required storage, provided storage and associated elevation and flow for the permanent pool, 25mm (extended detention), and 2 through 100 year return period storm events where applicable for each facility;
 +
*An operations and maintenance manual (includings a maintenance schedule) should be included in the SWM Report for all LID facilities in accordance with municipal requirements;
 +
*Complete information on proposed manufactured treatment devices is to be provided including current status under [[Pretreatment#Concentrated underground flow|ETV protocols]];
 +
===Quantity control===
 +
*Runoff coefficient or imperviousness calculations;
 +
*Analysis using appropriate storm distributions;
 +
*Pre-development peak flow (m³/s);
 +
*Post-development uncontrolled peak flow (m³/s);
 +
*Post-development controlled peak flow (m³/s);
 +
*LID Facility Type;
 +
*Stage – Storage – Discharge Table;
 +
*Outlet design and calculations;
 +
*Total storage required (m<sup>3</sup>);
 +
*Total storage provided (m<sup>3</sup>);
 +
*Table comparing provided versus required;
 +
*Overland flow conveyance and design;
 +
*External drainage conveyance (100 year and Regional);
 +
===Quality control===
 +
*Level of protection;
 +
*Drainage area to facility in hectares;
 +
*Percentage impervious – total and directly connected areas;
 +
*SWM facility monitoring and maintenance requirements;
 +
 
 +
==Hazard land management==
 +
*Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings;
 +
*Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only);
 +
*Wetlands and required setbacks determined and identified on plans;
 +
*Meanderbelt assessment and/or setback determined and identified on plans;
 +
*Wave uprush and/or wind setup elevations calculated;
 +
*“Limit of development” shown on plans;
 +
*Survey and floodplain mapping submitted (see below);
 +
*Hydraulic modelling and analysis including digital files;
 +
==Other==
 +
*Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format;
 +
----
 +
===Floodplain mapping and documentation minimum requirements===
 
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
 
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
 
# Existing and proposed floodplain delineation;
 
# Existing and proposed floodplain delineation;
Line 10: Line 182:  
# Natural features such as watercourses and wetlands;
 
# Natural features such as watercourses and wetlands;
 
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
 
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
==Survey Documentation Minimum Requirements==
+
===Survey documentation minimum requirements===
 
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
 
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
 
# Document with text descriptor identifying overall approach and methodology;
 
# Document with text descriptor identifying overall approach and methodology;
Line 27: Line 199:  
# Digital copy of the survey data when applicable; and
 
# Digital copy of the survey data when applicable; and
 
# Submission components to be stamped and signed by an OLS, P.Eng. or C.E.T. as relevant.
 
# Submission components to be stamped and signed by an OLS, P.Eng. or C.E.T. as relevant.
==Geospatial Data Submission Minimum Requirements==
+
 
 +
===Geospatial data submission minimum requirements===
 
For a submission which contain drawings, figures, reports, modelling and / or memos that present geospatial information and its analysis; the following list of minimum requirements must be included:
 
For a submission which contain drawings, figures, reports, modelling and / or memos that present geospatial information and its analysis; the following list of minimum requirements must be included:
 
# Text summary identifying methodology and software used in geospatial analysis;
 
# Text summary identifying methodology and software used in geospatial analysis;