Changes

Jump to navigation Jump to search
m
no edit summary
Line 15: Line 15:  
|
 
|
 
*[[Permeameter]]
 
*[[Permeameter]]
*Double ring infiltrometer
+
*[[Double ring infiltrometer]]
*Cased borehole ([[percolation test]])
+
*[[Percolation test]]
 
|
 
|
 
*[[Grain size analysis]] (Hazen)
 
*[[Grain size analysis]] (Hazen)
Line 23: Line 23:  
*Soil textural classification   
 
*Soil textural classification   
 
|}
 
|}
 +
 +
==Becoming familiar with the different measurement practices==
 +
STEP have produced a free online module to provide some basic information on infiltration test methods. Register [https://sustainabletechnologies.ca/events/design-infiltration-rate-e-learning-course/ '''HERE''']
 +
 
==Safety correction==
 
==Safety correction==
 
The measured or calculated infiltration rate must be divided by a value between 2 and 3 before use in design<ref>Design criteria for infiltration. (2018, February 14). Minnesota Stormwater Manual, . Retrieved 00:16, March 14, 2018 from https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_infiltration&oldid=35583.</ref>  
 
The measured or calculated infiltration rate must be divided by a value between 2 and 3 before use in design<ref>Design criteria for infiltration. (2018, February 14). Minnesota Stormwater Manual, . Retrieved 00:16, March 14, 2018 from https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_infiltration&oldid=35583.</ref>  
Line 42: Line 46:     
==Planning for testing==
 
==Planning for testing==
 +
 
===Background Evaluation===
 
===Background Evaluation===
 
Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to:
 
Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to:
Line 61: Line 66:     
===Sampling===
 
===Sampling===
 +
[[File:Test_pit.jpg|thumb|Infiltration testing should be carried out at relevant stages down through the profile of a test pit.]]
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
  
8,255

edits

Navigation menu