Changes

Jump to navigation Jump to search
m
no edit summary
Line 15: Line 15:  
|
 
|
 
*[[Permeameter]]
 
*[[Permeameter]]
*Double ring infiltrometer
+
*[[Double ring infiltrometer]]
*Cased borehole ([[percolation test]])
+
*[[Percolation test]]
 
|
 
|
 
*[[Grain size analysis]] (Hazen)
 
*[[Grain size analysis]] (Hazen)
Line 42: Line 42:     
==Planning for testing==
 
==Planning for testing==
[[File:Test_pit.jpg|Infiltration testing should be carried out at relevant stages down through the profile of a test pit.]]
+
 
 
===Background Evaluation===
 
===Background Evaluation===
 
Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to:
 
Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to:
Line 62: Line 62:     
===Sampling===
 
===Sampling===
 +
[[File:Test_pit.jpg|thumb|Infiltration testing should be carried out at relevant stages down through the profile of a test pit.]]
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
  
8,255

edits

Navigation menu