Changes

Jump to navigation Jump to search
m
no edit summary
Line 15: Line 15:  
|
 
|
 
*[[Permeameter]]
 
*[[Permeameter]]
*Double ring infiltrometer
+
*[[Double ring infiltrometer]]
*Cased borehole ([[percolation test]])
+
*[[Percolation test]]
 
|
 
|
 
*[[Grain size analysis]] (Hazen)
 
*[[Grain size analysis]] (Hazen)
Line 42: Line 42:     
==Planning for testing==
 
==Planning for testing==
 +
 
===Background Evaluation===
 
===Background Evaluation===
 
Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to:
 
Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to:
Line 61: Line 62:     
===Sampling===
 
===Sampling===
 +
[[File:Test_pit.jpg|thumb|Infiltration testing should be carried out at relevant stages down through the profile of a test pit.]]
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
   Line 83: Line 85:  
* Tests must be conducted within 10 m of the infiltration practice footprint area.  
 
* Tests must be conducted within 10 m of the infiltration practice footprint area.  
 
* Where multiple test are carried out, they should be planned equidistant and mapped accordingly.  
 
* Where multiple test are carried out, they should be planned equidistant and mapped accordingly.  
* The recommendations above are guidelines. Additional tests should be conducted if local conditions indicate significant variability in soil types, geology, water table levels, depth and type of bedrock, topography, etc.
+
'''The recommendations above are guidelines'''
* Similarly, uniform site conditions may indicate that fewer test pits are required. Excessive testing and disturbance of the site prior to construction is not recommended. <ref>Christopher B. Burke Engineering LLC. (2009). Soil Infiltration Testing Protocol SOIL INFILTRATION TESTING PROTOCOL Purpose of this Protocol Who Should Conduct Testing. Retrieved from https://www.in.gov/ocra/files/Appendix F - Soil Infiltration Testing Protocol.pdf</ref>
+
Additional tests should be conducted if local conditions indicate significant variability in soil types, geology, water table levels, depth and type of bedrock, topography, etc. Similarly, uniform site conditions may indicate that fewer test pits are required. Excessive testing and disturbance of the site prior to construction is not recommended.<ref>Christopher B. Burke Engineering LLC. (2009). Soil Infiltration Testing Protocol SOIL INFILTRATION TESTING PROTOCOL Purpose of this Protocol Who Should Conduct Testing. Retrieved from https://www.in.gov/ocra/files/Appendix%20F%20-%20Soil%20Infiltration%20Testing%20Protocol.pdf</ref>
 +
 
 
----
 
----
 +
[[Category:Infiltration]]