Changes

Jump to navigation Jump to search
Line 57: Line 57:  
:<math>b=\frac{xq}{nP}</math>
 
:<math>b=\frac{xq}{nP}</math>
   −
The rearrangement to calculate the required footprint area of the facility for a given depth is not available at this time. Submissions are welcome.  
+
The rearrangement to calculate the required footprint area of the facility for a given depth is not available at this time. Elegant submissions are invited.  
   −
To calculate the time (''t'') to empty the facility:  
+
To calculate the time (''t'') to fully drain the facility:  
 
<math>t=\frac{nP}{qx}ln\left [ \frac{\left (d+ \frac{P}{x} \right )}{\left(\frac{P}{x}\right)}\right]</math>
 
<math>t=\frac{nP}{qx}ln\left [ \frac{\left (d+ \frac{P}{x} \right )}{\left(\frac{P}{x}\right)}\right]</math>
    
[[category: modeling]]
 
[[category: modeling]]
 
[[category: infiltration]]
 
[[category: infiltration]]
8,255

edits

Navigation menu