Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1: −
Input data:  
+
Before beginning the sizing calculations most of the following parameters must be known or estimated.
 +
The exceptions are the depth (''d'') and Permeable area (''P''), as only one of these is required to find the other.
 +
Note that some of these parameters are limited:
 +
*The ''maximum'' total depth will be limited by construction practices i.e. not usually > 2 m.
 +
*The ''maximum'' total depth may be limited by the [[Infiltration| conditions underground]] e.g. the groundwater or underlying geology/infrastructure.
 +
*The minimum total depth may be limited by the need to support vegetation i.e. not < 0.6 m.
 +
 
 +
 
 +
*The area P for a [[green roofs]], [[absorbent landscapes]] and [[permeable paving]] may be very similar or equal to the catchment area, so that the I/P ratio is close to 1.
 +
*[[Infiltration trenches]], [[Infiltration chambers| chambers]] and [[bioretention cells]] have a maximum recommended I/P ratio of 20.
 +
 
 
{|class="wikitable"
 
{|class="wikitable"
|+ Inputs
+
|+ Inputs  
 
|-  
 
|-  
 
!style="background: darkcyan; color: white"|Symbol
 
!style="background: darkcyan; color: white"|Symbol
Line 19: Line 29:  
|''d''||m||depth of Infiltration facility or BMP
 
|''d''||m||depth of Infiltration facility or BMP
 
|-
 
|-
|''P''||m2<sup>2</sup>||Permeable area i.e. area of the facility or BMP
+
|''P''||m<sup>2</sup>||Permeable area i.e. area of the facility or BMP
 
|}
 
|}
    +
To calculate the required depth, where the area of the facility is constrained:
 +
<math>d=\frac{D\left (\left [ I/P \right ]i-q \right )}{n}</math>
     
8,255

edits

Navigation menu