Changes

Jump to navigation Jump to search
no edit summary
Line 3: Line 3:  
*Determine the impervious catchment area (''I''), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the total catchment area to be required for the BMP. The area of the facility on the ground will be 'P' (pervious).
 
*Determine the impervious catchment area (''I''), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the total catchment area to be required for the BMP. The area of the facility on the ground will be 'P' (pervious).
 
*Unless the biomedia fill material has been tested and certified otherwise, a porosity value (''n'') of 0.35 may be assumed (i.e. void ratio 35%).
 
*Unless the biomedia fill material has been tested and certified otherwise, a porosity value (''n'') of 0.35 may be assumed (i.e. void ratio 35%).
*Bioretention facilities are usually between 0.5 m and 1.25 m deep, owing to construction considerations. Determine the maximum available depth (''c<sub>c max</sub>'') from the site constraints. The [[Infiltration]] page lists these.  
+
*Bioretention facilities are usually between 0.5 m and 1.25 m deep, owing to construction considerations. Determine the maximum available depth of the facility (''d<sub>f max</sub>'') from the site constraints. The [[Infiltration]] page lists these.  
 
Identify the duration (''D'') and intensity (''i'') of design storm(s).
 
Identify the duration (''D'') and intensity (''i'') of design storm(s).
Calculate the required pervious area
+
Calculate the required facility area (''P'').
    
<math>d_{f}=\frac{D\left (\left [ I/P \right ]i-q \right )}{n}</math>
 
<math>d_{f}=\frac{D\left (\left [ I/P \right ]i-q \right )}{n}</math>
8,255

edits

Navigation menu