Changes

Jump to navigation Jump to search
no edit summary
Line 55: Line 55:  
* Design storm duration, D (h)
 
* Design storm duration, D (h)
 
* Infiltration volume target for the design storm event, V<sub>i</sub> (m<sup>3</sup>), based on average annual water budgets for the catchment for pre- and post-development scenarios and equal to the infiltration volume deficit (pre-development minus post-development annual infiltration)
 
* Infiltration volume target for the design storm event, V<sub>i</sub> (m<sup>3</sup>), based on average annual water budgets for the catchment for pre- and post-development scenarios and equal to the infiltration volume deficit (pre-development minus post-development annual infiltration)
* Drainage time, t (h), time required to fully drain the active water storage components of the practice (i.e surface ponding and infiltration water storage depths), based on local criteria or long term average inter-event period for the location
+
* Drainage time, t (h), time required to fully drain the active water storage components of the practice (i.e surface ponding and active storage reservoir depths), based on local criteria or long term average inter-event period for the location
 
* Field measured infiltration rate of the underlying native soil, f (mm/h), median of field measurements or based on interpolation from median grain-size distribution results
 
* Field measured infiltration rate of the underlying native soil, f (mm/h), median of field measurements or based on interpolation from median grain-size distribution results
 
* Design infiltration rate of the underlying native soil, f' (mm/h), median field measured value, f divided by a safety factor, z
 
* Design infiltration rate of the underlying native soil, f' (mm/h), median field measured value, f divided by a safety factor, z
Line 61: Line 61:  
* Proposed surface grade elevation at the practice location (metres above sea level, masl)
 
* Proposed surface grade elevation at the practice location (metres above sea level, masl)
 
* Elevation of the seasonally high water table or bedrock surface (metres above sea level, masl), below the practice location
 
* Elevation of the seasonally high water table or bedrock surface (metres above sea level, masl), below the practice location
* Effective porosity of the storage reservoir fill material(s), including any void-forming structures (e.g. pipes, chambers, tanks, soil cells, etc.) and surrounding aggregate, n<sub>r</sub>'
+
* Effective porosity of the storage reservoir fill material, including any void-forming structures (e.g. pipes, chambers, tanks, soil cells, etc.) and surrounding aggregate, n'
 
* Types of plants to be supported by the filter media bed (i.e. grasses vs. mix of grasses, plants and shrubs vs. trees)
 
* Types of plants to be supported by the filter media bed (i.e. grasses vs. mix of grasses, plants and shrubs vs. trees)
 
* How runoff will be delivered to the practice (i.e. to surface ponding area, or directly to storage reservoir)
 
* How runoff will be delivered to the practice (i.e. to surface ponding area, or directly to storage reservoir)
   −
This spreadsheet tool has been set up to perform all of the bioretention sizing calculations shown below and allows side-by-side comparison of equation outputs for each potential design approach.<br>
+
This spreadsheet tool has been set up to perform all of the bioretention sizing calculations shown below and allows side-by-side comparison of equation outputs for each potential design approach or constraint scenario.<br>
 
{{Clickable button|[[Media:Infiltration Sizing 20200525 locked.xlsx|Download the infiltration practice sizing tool]]}}
 
{{Clickable button|[[Media:Infiltration Sizing 20200525 locked.xlsx|Download the infiltration practice sizing tool]]}}
  