Changes

Jump to navigation Jump to search
m
Line 15: Line 15:  
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''V'' = Required volume of storage in m<sup>3</sup>
 
*''V'' = Required volume of storage in m<sup>3</sup>
*''V<sub>R</sub>'' = Void ratio (porosity), as measured (or default to 0.35 for all aggregates)   
+
*''V<sub>R</sub>'' = Void ratio (porosity), as measured (or default to 0.35)   
 
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
 
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
*''d<sub>T</sub>'' = Total depth of infiltration practice in m = ''d<sub>b</sub>'' + ''d<sub>m</sub>'' + ''d<sub>R</sub>''}}
+
*''d<sub>T</sub>'' = Total depth of infiltration practice in m (= ''d<sub>b</sub>'' + ''d<sub>m</sub>'' + ''d<sub>R</sub>'')}}
    
===Step 1 alternative, accounts for infiltration during a design storm event===
 
===Step 1 alternative, accounts for infiltration during a design storm event===
8,255

edits

Navigation menu