Changes

Jump to navigation Jump to search
Line 159: Line 159:  
* Step 16. Determine if downstream [[flow control]] is required to achieve hydrologic objectives.
 
* Step 16. Determine if downstream [[flow control]] is required to achieve hydrologic objectives.
   −
===Calculating infiltration practice drainage time, t assuming 1 dimensional (1D) drainage===
+
===Calculating infiltration practice drainage time, t assuming one dimensional (1D) drainage===
 
This spreadsheet allows calculation of drainage time assuming one dimensional drainage under zero head conditions, mean head conditions and falling head conditions. It provides a conservative estimate of drainage time for the purposes of groundwater mounding analysis, where shorter drainage times cause a greater impact.  
 
This spreadsheet allows calculation of drainage time assuming one dimensional drainage under zero head conditions, mean head conditions and falling head conditions. It provides a conservative estimate of drainage time for the purposes of groundwater mounding analysis, where shorter drainage times cause a greater impact.  
  

Navigation menu