* Step 1: Based on the median measured infiltration rate of the native soil at the estimated location and bottom elevation of the practice, or estimated from the median grain-size distribution results, decide if an underdrain will be included in the design. See [[Design infiltration rate]] for guidance on field tests, methods and number of test locations and tests (i.e. measurements) to be performed.<br>
+
* Step 1: Based on the median measured infiltration rate of the native soil at the proposed location and bottom elevation of the practice, or estimated infiltration rate from median grain-size distribution results, decide if an underdrain will be included in the design. See [[Design infiltration rate]] for guidance on field tests, methods and number of test locations and tests (i.e. measurements) to be performed.<br>
If the median measured or field estimated infiltration rate of the underlying native soil (f) is less than 15 mm/h, include an underdrain.
+
If the median field measured or estimated infiltration rate of the underlying native soil (f) is less than 15 mm/h, include an underdrain.
    