Changes

Jump to navigation Jump to search
m
Line 20: Line 20:  
</imagemap>
 
</imagemap>
   −
On commercial, industrial and multi-unit developments, a popular choice is to integrate bioretention into parking lot landscaped areas. These distributed cells typically accept sheet flow through multiple curb cuts, have shallow depression storage ≤ 100 mm, and a total area of 5 -200 m<sup>2</sup>. Although many parking lot schemes include long linear bioretention cells (≥ 0.6 m wide), infiltration is optimized by having a level grade and a level base, unlike a [[Bioswales|bioswale]].
+
On commercial, industrial and multi-unit developments, a popular choice is to integrate [[bioretention]] into parking lot landscaped areas. These distributed cells typically accept sheet flow through multiple curb cuts, have shallow depression storage ≤ 100 mm, and a total area of 5 -200 m<sup>2</sup>. Although many parking lot schemes include long linear bioretention cells (≥ 0.6 m wide), infiltration is optimized by having a level grade and a level base, unlike a [[Bioswales|bioswale]].
 +
 
 +
===Winter maintenance===
 +
Salt can be damaging to the planting in parking lot bioretention. To help minimize this, bioretention practices adjacent to parking areas should always have an [[underdrain]] and salt use be reduced through good design and planning of the [[salt management| parking lot]].
    
==Gallery==
 
==Gallery==
Line 39: Line 42:  
*[[Choking layer]]
 
*[[Choking layer]]
 
*[[Reservoir_aggregate|Reservoir]]
 
*[[Reservoir_aggregate|Reservoir]]
 +
*[[underdrain]]
390

edits

Navigation menu