Changes

Jump to navigation Jump to search
no edit summary
Line 26: Line 26:  
||
 
||
 
|Mulch composition should be correct
 
|Mulch composition should be correct
 +
|-
 +
!colspan =2|Elevations
 +
|-
 +
|style="width:30px"| 
 +
|Depth of the gravel and invert of the underdrain
 +
|-
 +
||
 +
|Inverts for inflow and outflow points
 +
|-
 +
||
 +
|Filter media depth
 +
|-
 +
||
 +
|Ponding depth provided between the surface of the filter bed and the overflow structure
 +
|-
 +
||
 +
|Mulch depth
 +
|-
 +
!colspan =2|Landscaping and Stabilization
 +
|-
 +
|style="width:30px"| 
 +
|Correct vegetation should be planted
 +
|-
 +
||
 +
|Pretreatment area should be stabilized
 +
|-
 +
||
 +
|Drainage area should be stabilized prior to directing water to the bioretention
 +
|-
 +
!colspan =2|The following items should be checked after the first rainfall event, and adjustments should be made as necessary:
 +
|-
 +
|style="width:30px"| 
 +
|Outfall protection/energy dissipation at concentrated inflow should be stable
 +
|-
 +
||
 +
|Flow should not concentrate and should spread evenly over the filter bed
 +
|-
 +
||
 +
|Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. <br> The biomedia should fully drain within a maximum period of 72 hours
 +
|-
 +
||
 +
|Excessive sediment accumulation should not be present
 
|}
 
|}
  −
<tr><th colspan =2>Elevations</th></tr>
  −
<tr><td width = "5%"></td><td>Depth of the gravel and invert of the underdrain</td></tr>
  −
<tr><td></td><td>Inverts for inflow and outflow points</td></tr>
  −
<tr><td></td><td><strong>Filter depth?</strong> after biomedia is placed</td></tr>
  −
<tr><td></td><td>Ponding depth provided between the surface of the filter bed and the overflow structure</td></tr>
  −
<tr><td></td><td>Mulch depth</td></tr>
  −
<tr><th colspan =2>Landscaping and Stabilization</th></tr>
  −
<tr><td width = "5%"></td><td>Correct vegetation should be planted</td></tr>
  −
<tr><td></td><td>Pretreatment area should be stabilized</td></tr>
  −
<tr><td></td><td>Drainage area should be stabilized prior to directing water to the bioretention</td></tr>
  −
<tr><th colspan =2>The following items should be checked after the first rainfall event, and adjustments should be made as necessary:</th></tr>
  −
<tr><td width = "5%"></td><td>Outfall protection/energy dissipation at concentrated inflow should be stable</td></tr>
  −
<tr><td></td><td>Flow should not concentrate and should spread evenly over the filter bed</td></tr>
  −
<tr><td></td><td>Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. <br> The biomedia should fully drain within a maximum period of 72 hours</td></tr>
  −
<tr><td></td><td>Excessive sediment accumulation should not be present</td></tr>
  −
</table>
      
[[category:Checklists]]
 
[[category:Checklists]]
 
[[category:Construction]]
 
[[category:Construction]]

Navigation menu