Changes

Jump to navigation Jump to search
Line 124: Line 124:  
===Proximity to Underground Utilities===
 
===Proximity to Underground Utilities===
 
Designers should consult local utility design guidance for the horizontal and vertical clearances required between storm drains, ditches, and surface water bodies.
 
Designers should consult local utility design guidance for the horizontal and vertical clearances required between storm drains, ditches, and surface water bodies.
===Karst===
+
===[[Karst]]===
 
Infiltration designs are unsuitable in areas of known or implied [[Karst |karst]] topography and geologic formations.
 
Infiltration designs are unsuitable in areas of known or implied [[Karst |karst]] topography and geologic formations.
  

Navigation menu