Line 125: Line 125:  
Designers should consult local utility design guidance for the horizontal and vertical clearances required between storm drains, ditches, and surface water bodies.
 
Designers should consult local utility design guidance for the horizontal and vertical clearances required between storm drains, ditches, and surface water bodies.
 
===Karst===
 
===Karst===
Infiltration designs are unsuitable in areas of known or implied [[Karst |karst]]topography and geologic formations.
+
Infiltration designs are unsuitable in areas of known or implied [[Karst |karst]] topography and geologic formations.
    
===Overhead Wires===
 
===Overhead Wires===