Search results

Jump to navigation Jump to search
  • ...edia that meets design specifications. Test surface infiltration rate (one test for every 25 m2 of filter bed area) to confirm it is > 25 mm/h. Replace [[s ...ilter media that meets specifications. Test surface infiltration rate (one test for every 25 m2 of filter bed area) to confirm it is > 25 mm/h. Replace sto
    40 KB (5,747 words) - 15:11, 4 August 2023
  • #Test and ensure green roof irrigation systems functions properly
    13 KB (1,912 words) - 22:24, 28 September 2022
  • ...ss than 0.5% wash loss, by mass, when tested per the AASHTO T-11 wash loss test. AASHTO No. 3 and No. 57 stone can meet this specification.
    11 KB (1,750 words) - 18:21, 6 August 2020
  • ...nded inspection types to utilize, and understanding standard protocols and test methods.<ref>STEP. 2022. Integrating Low Impact Development into Stormwater ...to ensure your LID installations are operating at optimal levels and each test is used for specific BMPs. To learn about the associated equipment and trai
    28 KB (3,946 words) - 14:41, 11 March 2024
  • ...ign infiltration rate]] for guidance on field tests, methods and number of test locations and tests (i.e. measurements) to be performed.<br>
    17 KB (2,743 words) - 18:59, 21 May 2024
  • ...rable. Restore grades with planting soil that meets design specifications. Test surface infiltration rate to confirm it is > 15 mm/h. Replace [[stone]] and ...ost 15 cm of material with planting soil that meets design specifications. Test [[Infiltration: Testing|surface infiltration rate]] to confirm it has been
    38 KB (5,498 words) - 15:25, 4 August 2023
  • ...fficiencies vs surface loading rates) [[Oil and Grit Separator#Performance Test Results|'''on our OGS page here''']]. <br>
    24 KB (3,388 words) - 20:53, 23 April 2024
  • ...etention]] cells to manage stormwater runoff. The site also incorporates a test strip of special [[Permeable pavement]] containing recycled material, refer ...the fall of 2007. The site was selected by the MTO as an ideal location to test the use of pervious concrete mix ([[Permeable pavement]]) as a substitute f
    81 KB (11,704 words) - 20:55, 20 April 2023
  • .../A23.2-09 (R2014). Concrete materials and methods of concrete construction/Test methods and standard practices for concrete. standard A23.1-09. https://ww
    30 KB (4,258 words) - 16:38, 28 October 2022
  • *Inspect and test for proper function annually.
    31 KB (4,474 words) - 20:40, 3 October 2022
  • ...to neutrality. If soil pH is higher than 7.8, amend with [[compost]] or [[Test pit|sulphur]] to lower the pH back to neutrality.
    32 KB (4,600 words) - 20:59, 29 September 2022
  • ...s to the water supply, flush lines to clear out any debris or sediment and test to confirm that the system is undamaged and functioning well;
    37 KB (5,353 words) - 18:37, 4 October 2022
  • ...n steel drum vibratory roller. A light weight deflectometer may be used to test compaction level of open graded stone and compare to specifications.
    41 KB (5,625 words) - 19:34, 3 April 2023
  • ...he program, salt spreading equipment is calibrated according to a standard test procedure, and contractors undertake in-field training to ensure familiarit
    64 KB (9,233 words) - 21:03, 22 May 2024
  • ...ied as playing important roles. They identified further research needed to test the hypothesis that native or diversely-planted facilities perform better t
    74 KB (9,862 words) - 15:09, 4 August 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)