Changes

Jump to navigation Jump to search
m
Line 79: Line 79:  
|Permeable pavement<ref name = "IMAX"/>||3 years||Silty clay fill over clay till||1:1||0.025||49
 
|Permeable pavement<ref name = "IMAX"/>||3 years||Silty clay fill over clay till||1:1||0.025||49
 
|}
 
|}
<nowiki>*</nowiki>Represents depth of sump below underdrain or outflow pipe.  In some cases, a flow control device was installed to slow outflow rates and enhance infiltration
+
<nowiki>*</nowiki>Represents depth of sump below [[underdrain]] or [[overflow]] pipe.  In some cases, a [[flow control]] device was installed to slow outflow rates and enhance infiltration
    
----
 
----
8,255

edits

Navigation menu