Changes

Jump to navigation Jump to search
m
Line 57: Line 57:  
===Finish course===
 
===Finish course===
 
Consult the manufacturer for the design specifications of their product. In pervious concrete and porous asphalt systems, the concrete or asphalt mix specifications and construction procedures are key to proper functioning. These systems require well-trained and experienced contractors for installation.
 
Consult the manufacturer for the design specifications of their product. In pervious concrete and porous asphalt systems, the concrete or asphalt mix specifications and construction procedures are key to proper functioning. These systems require well-trained and experienced contractors for installation.
 +
 
{{:Permeable paving: Specifications}}
 
{{:Permeable paving: Specifications}}
  
8,255

edits

Navigation menu