Changes

Jump to navigation Jump to search
m
Line 85: Line 85:  
{{Clickable button|[[Media:Darcy drainage.xlsx|Download drainage time calculator(.xlsx)]]}}
 
{{Clickable button|[[Media:Darcy drainage.xlsx|Download drainage time calculator(.xlsx)]]}}
   −
===Drainage time (3D)===
+
===Drainage time (3D)<ref>Woods Ballard, B., S. Wilson, H. Udale-Clarke, S. Illman, T. Scott, R. Ahsley, and R. Kellagher. 2016. The SuDS Manual. 5th ed. CIRIA, London.</ref>===
 
[[file:Hydraulic radius.png|thumb|Two practice areas of 9 m<sup>2</sup>.<br> P = 12 m (left), P = 20 m (right)]]
 
[[file:Hydraulic radius.png|thumb|Two practice areas of 9 m<sup>2</sup>.<br> P = 12 m (left), P = 20 m (right)]]
 
In some situations, it may be possible to reduce the size of the bioretention required, by accounting for rapid drainage. Typically, this is only worth exploring over sandy soils with rapid infiltration.  
 
In some situations, it may be possible to reduce the size of the bioretention required, by accounting for rapid drainage. Typically, this is only worth exploring over sandy soils with rapid infiltration.  
Line 105: Line 105:  
Note that this is a minor adaptation (metric units and formatting) from the original tool, written and [https://pubs.usgs.gov/sir/2010/5102/ hosted by the USGS].
 
Note that this is a minor adaptation (metric units and formatting) from the original tool, written and [https://pubs.usgs.gov/sir/2010/5102/ hosted by the USGS].
 
</poem>
 
</poem>
 +
----
8,255

edits

Navigation menu