Line 14: |
Line 14: |
| | | |
| ==Planning== | | ==Planning== |
− | | + | {| class="wikitable" |
| + | |+ Things to consider when planning a rooftop detention system |
| + | |- |
| + | !Advantages |
| + | !Limitations |
| + | |- |
| + | | |
| + | *Does not require ground level space, so particularly well suited where ground space is limited or sites with large flat roofs, |
| + | *May not require additional sewer connections, |
| + | *Easy to retrofit if structural support and waterproofing are adequate, |
| + | *Relatively low cost |
| + | | |
| + | *Absolutely need regular inspection and maintenance, |
| + | *Limited application on sloped roofs or sites with small building footprints, |
| + | *Do not provide any co-benefits such as habitat creation or air quality improvements associated with vegetated practices, |
| + | *Mechanical systems and other rooftop architectural features must not be adversely impacted by ponded water. |
| + | |} |
| | | |
| ==Design== | | ==Design== |