Line 13: Line 13:  
*''t'' = Time to fill stone bed (typically 2 hr)  
 
*''t'' = Time to fill stone bed (typically 2 hr)  
 
*''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. [[reservoir aggregate|clear stone]])}}  
 
*''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. [[reservoir aggregate|clear stone]])}}  
 +
 +
On highly permeable soils (e.g., infiltration rate of 45 mm/hr or greater), a maximum stone reservoir depth of 2 metres is recommended to prevent soil compaction and loss of permeability from the mass of overlying stone and stored water.
    
===To calculate the invert of the underdrain from the base of the reservoir===
 
===To calculate the invert of the underdrain from the base of the reservoir===
Line 22: Line 24:  
*''0.4'' = Void ratio of [[Reservoir aggregate|clear stone]]}}
 
*''0.4'' = Void ratio of [[Reservoir aggregate|clear stone]]}}
   −
----
  −
(f') used in the above equations should be the [[design infiltration rate]] that incorporates a safety correction factor. On highly permeable soils (e.g., infiltration rate of 45 mm/hr or greater), a maximum stone reservoir depth of 2 metres is recommended to prevent soil compaction and loss of permeability from the mass of overlying stone and stored water.
   
----
 
----
 
When sizing the area of permeable paving based on the contributing drainage area, the following equation may be used:
 
When sizing the area of permeable paving based on the contributing drainage area, the following equation may be used: