*Well(s), of 100 - 150 mm diameter perforated pipe, should extend to the bottom of the facility.
+
*[[Wells]], of 100 - 150 mm diameter perforated pipe, should extend to the bottom of the facility.
−
*Where a horizontal underdrain is being installed, an upstream and a downstream well should be coupled to the underdrain pipe. The pair of wells can then be used to flush out the length of underdrain if required.
+
*The exposed tops of all wells should be fitted with lockable caps.
−
*The exposed tops of all wells should be fitted with lockable caps.